Title Page
-
Area
-
Conducted on
-
Prepared by
QA Signoff
Please answer questions.
-
Brickwork walls plumb to within tolerance
-
Masonry built to correct datum height
-
Door/ window measurement correct size (External and Internal)
-
Area fully pointed
-
Ties in correct location
-
Thermobate / closure installed
-
Insulation installed correctly
-
Expansion joints and ties correctly installed
-
Cavities clear of debris
-
Cavity trays installed where required, complete with weep vents
-
Fire barriers/socks installed where required
-
Area scraped off and tidy
-
Location cleaned down
Signed off by:
-
CMR Signature:
-
Date: