Title Page

  • Area

  • Conducted on

  • Prepared by

QA Signoff

Please answer questions.

  • Brickwork walls plumb to within tolerance

  • Masonry built to correct datum height

  • Door/ window measurement correct size (External and Internal)

  • Area fully pointed

  • Ties in correct location

  • Thermobate / closure installed

  • Insulation installed correctly

  • Expansion joints and ties correctly installed

  • Cavities clear of debris

  • Cavity trays installed where required, complete with weep vents

  • Fire barriers/socks installed where required

  • Area scraped off and tidy

  • Location cleaned down

Signed off by:

  • CMR Signature:

  • Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.