Title Page

  • Conducted on

  • Prepared by

  • Location

Haul Roads & Edge Protection

  • Is there a full safety bund along side edges and water bodies (except in restored areas where this is not applicable)?

  • Are there any potholes, deterioration of surface or any obstructions?

  • Are any haul roads of insufficient width?

  • Are there any edges without adequate 1.5m Edge Protection?

  • Are there any bunds lower than the 2m Tarmac Standard height?

  • Details of recommended remedial works / actions:

  • Have you missed any new working areas that need edge protection?

Dredging

  • At the dredger working area is there a safety bund that restricts access to the working dredged face?

  • Where access is not restricted, is there a 5m stand-off from the working dredged face?

Excavations (Dry including Stripping activities)

  • Are Stripping Activities been undertaken?

  • Are working faces stable?

  • Is the temporary edge protection in place and adequate?

  • Are all dry excavation faces stable?

  • Is there adequate edge protection where vehicles have access?

Excavations (Casting Wet)

  • Are Excavations (Casting Wet) been undertaken?

  • Is the working area stable?

  • Are there suitable life buoys available?

  • Has the Daily Extraction From Under Water Risk Assessment been completed prior to work commencing?

  • Is there adequate edge protection where vehicles have access?

Tips (Active - Raw Material to Plant)

  • Are tipping operations of unprocessed material at the plant being undertaken?

  • Is the tipping area level?

  • Is end tipping prevented?

  • Are there any signs of cracks, slumping or movement appearing?

  • Is a Loading Shovel being used to manage the tip?

  • Are the tips safe, not showing signs of failure and have where applicable adequate bunding?

Tips (Active - Restoration & Material to Dredger)

  • Are tipping operations being undertaken?

  • Are the tips safe, not showing signs of failure and have adequate bunding? (Bunding not applicable in restoration tip)

  • Is the tipping area level?

  • Is end tipping prevented?

  • Are there any signs of cracks, slumping or movement appearing?

  • Is a Dozer being used to manage the tip? (Or if no tipping today, has a Dozer been used?)

  • What measures are in place to keep the tip level and prevent end tipping?

Quality

  • Is the material that is to be hauled for processing of a suitable quality?

  • Quality Issues / Remedial Actions:

General

  • Did you note any other points of interest or concern (if yes please give details)?

  • List of Interests or Concerns

  • Any defects requiring Geotechnical Department / Specialist Notification?

  • Details of recommended remedial works / actions

Completion

  • Sign Off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.