Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Project Manager
-
Personnel encountered during Inspection
To be completed daily
-
Toilets clean and adequately supplied (toilet roll, hand soap, etc.)
-
Drying Room clean and free from waste & clutter
-
Office clean and free from waste & clutter
-
Canteen clean and free from clutter (incl. equipment; microwave, fridge etc.)
-
First aid kit easily accessible
-
First aid kit contents clean and valid dates
-
Are escape routes free from obstruction (corridors, stairs, doorways & outdoor routes to assembly point)
-
Emergency exit and assembly point signs visible
-
Fire alarm working
-
Emergency evacuation plan in place
-
Emergency evacuation drill conducted. Last drill was:
-
Walkways free of waste, obstructions, slip & trip hazards
-
Work areas free of waste, obstructions, slip & trip hazards
-
Bins emptied regularly
-
Skips situated at suitable points
-
Are all specialist waste disposed of suitably
-
Is there a concrete washout - does it need emptied?
-
Electrical leads properly secure (e.g. not across walkways/no trip hazards)
-
All electrical leads, sockets, cords & switches in good working order
-
All electrical appliances are kept clear of wet areas
-
No smoking on site (smoking area being utilised)
-
Permits in place and completed adequately
-
Signage in place and in good order
-
Daily Pre Start Checks completed on all plant
-
Are beacons working on all plant
-
Seatbelts being worn
-
Trained personnel operating plant
-
Is machinery left running when not in use
-
Are plant keys being removed when not in use
-
All chemicals stored correctly and labelled
-
MSDS & COSHH Assessment available for all chemicals on site
-
Is there evidence of any chemical leakage or spillage
-
Fire Extinguisher and spill kit available in all plant
-
Personnel wearing appropriate PPE incl. hearing protection RPE, etc...
-
Daily JSSP completed and relevant to works
-
JSSP completed by relevant personnel
-
RAMS relevant to works being carried out
-
RAMS briefed and signed by relevant personnel
-
All personnel signed into daily sign in book
-
Excavations suitable and safe incl. batters back, stepped, barriered off , spoil stored away from edge, edge protection, signage, etc.
-
Stores clean and free from clutter
-
Has cutting equipment been fitted with suitable dust suppression
-
Are work stations suitable
-
Is there adequate plant/pedestrian segregation
-
Are ladders in good condition and being used correctly
-
Are scaffolds/mobile towers etc. correctly by a trained & competent person
-
Any falsework, formwork or temporary structures on site in suitable conditions
-
Proper equipment used for the handling of materials (e.g. telehandler, forks, etc.)
-
Lift plan in place for activities being carried out (ensure correct plant & equipment noted on the lift plan)