Title Page
-
Foreman Job/Phase:
-
Job Location / Address
-
Date:
Employees in Attendance
-
Names
- Jeff West
- Carson Tippie
- Shaun Tippie
- David Leaf
- Derik Tippie
- Alec Diehl
- Rebecca Tippie
Huddle/JSA
Jobsite Conditions:
-
Start Time:
-
Weather:
Jobsite Setup:
-
Side Walks Secure:
-
Traffic Plan Secure:
-
Walk down of site completed, and all hazards identified?
-
Proper PPE:
-
Special PPE:
- FR Clothing
- SCBA/Resp.
- Other PPE
- NA
-
Please specify Other PPE
Daily Objective and Job Hazard Analysis:
Daily Task
-
Steps in the Plan
-
Identified Hazards in Task
- Overhead Utilities
- Lifting Equipment
- Underground Utilities
- Excavation Hazards
- Fire Hazards
- Vehicular or Heavy Equipment Traffic
- Noise Exposure
- Hand & Power Tools
- Hand Hazards
- Manual Lifting
- Ladders
- Slips, Trips & Fall Hazards
- Pinch Point Hazards
- SDS/Chemical Hazards
- Heat Stress
- Cold Stress
- Environmental Hazards
- Natural or Site Hazards
- Adjacent Work
- Work Zone
- Ergonomics
- Confined Spaces
-
Safe Mitigation Plan
- Required clearances met
- Spotter in place
- Red Zone Barricaded/Signal Person in place
- Tag Lines utilized
- Dig Ticket/ Review Dates/ Review Extent
- Review Prints/ Inspect for UNMARKED Utilities
- Inspection before each entry
- Observing 2'4'5' Rules
- Tab. Data available on site & in compliance with excavation requirements
- Protection from cave-in. Shoring box on site
- Fire Extinguisher Inspected/Fire Watch in place
- Flammables removed from area
- Cones/Signs/Barricades/Flaggers
- Hearing Protection (Ear plugs or muffs)
- Cords and GFCI Inspected prior to use
- Guarding in Place
- Proper Gloves for task
- Cut-proof gloves
- FR Rated gloves
- Protection against uncontrolled release of gas or air
- Potential for Hazardous Waste identified
- Pollution prevention in place
- Identified signs of Animals/Reptiles/Insects
Equipment:
-
Equipment inspected/proper condition:
-
Veh/Equip. parked to protect Work Area:
-
Overhead utilities located/identified:
Tooling:
-
Tools in proper working condition:
-
Special Tools & Equipment being used for the day:
-
Qualified to operate specialty tools:
-
Fire Extinguishers placed upwind and inspected:
Safety Precautions:
-
Stretch & Flex Completed:
-
Cones & Barricades properly placed:
-
Slips, Trips & Falls Hazards Identified:
-
Personal Impacts (fatigue, repetitive tasks, distractions, etc.) addressed and communicated.
-
Are All Crew Members aware of Crossings:
-
***All Crossings Visual Verified:
-
***Signature of Crew Member Verifying Crossings:
-
Excavation Inspection completed by Competent Person and requirements met?
-
Environmental/other potential Hazards:
-
Provide any additional notes, Near Miss and Stop Work Authority actions below:
-
Attach Photos Below:
-
Post Job Review (Post-job reviews gives employees that were involved in the work activity to provide feedback What went right? Wrong? Is there follow up needed? What lessons learned from this job can be shared to help others performing similar task?)
Signature
-
Add signature