Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
It is a reminder to all subcontractors that as a part of your contract you have a responsibility to tend to housekeeping on a daily basis.Those who fail to tend to their cleaning will have the cleaning carried out by Geocon at the subcontractors expense.
-
Be aware of an increased amount of plant and equipment on ground floor and typical floors.Never walk past a machine or near a machine without making eye contact with the operator.
-
Barricades and isolated areas to have signage, it is paramount that isolated areas be clearly identified along with the risk involved.
-
Ensure PPE is worn as instructed in TWS safe work method statement
-
Always use correct material handling methods when manoeuvring Windows around the floor and into each subframe.If you can't lift it ask for help.
-
All Windows utilising a jump scaffold must have hinged flaps turned away from window once glazed.
I have read and agree with the information above
-
Add signature