DAILY PSI MEETING FORM
-
DOCUMENT
-
PREPARED BY:
-
DAILY PRE SHIFT INSTRUCTION (PSI) MEETING
-
Conducted on
-
Site
PSI MEETING
SAFETY ITEMS RELATED TO PREVIOUS SHIFTS
-
ARE THERE ANY SAFETY ISSUES FROM PREVIOUS SHIFTS?
-
LIST ISSUES HERE
-
IF PERSONNEL ARE RETURNING FROM R&R, OR UNFAMILIAR WITH A WORK AREA - COMPLETE A SAFETY TOUR OF THE AREA WITH THAT PERSON / S
-
IS A SAFETY TOUR REQUIRED
-
ARE THERE ANY POTENTIAL SAFETY ISSUES FOR THIS SHIFT?
-
LIST ISSUES HERE
-
TYPE OF SHIFT?
-
Designated Leading Hand.
-
Are any Vehicle/Machines out of service from previous shifts?
-
Have they been tagged correctly with Out Of Service tag ?
VEHICLE & PLANT CHECKS
-
HAVE VEHICLE PRE STARTS BEEN COMPLETED?
-
ARE THERE ANY VEHICLE ISSUES?
-
ENTER FAULTY VEHICLES
VEHICLE
-
SELECT TYPE
- DRILL
- FORKLIFT
-
VEHICLE # (eg MV 012)
-
LIST FAULTS
-
HAVE PLANT & EQUIPMENT PRE STARTS BEE COMPLETED?
-
ARE THERE ANY PLANT OR EQUIPMENT ISSUES?
-
ENTER FAULTY PLANT
PLANT
-
SELECT TYPE
- DRILL
- FORKLIFT
-
PLANT # (GD 17)
-
LIST FAULTS
WORK ENVIRONMENT CHECKS
-
IS HOUSEKEEPING IN ORDER?
-
LIST ISSUES HERE
-
IS THE WORK AREA SAFE?
-
LIST ISSUES HERE
-
IS ACCESS TO THE WORK AREA SAFE?
-
LIST ISSUES HERE
PERSONAL PROTECTIVE EQUIPMENT
-
ARE ALL PERSONNEL TRAINED IN THE SAFE USE OF GENERAL PPE ?<br> (HEAD, EYE,/EAR PROTECTION, TAGS)
-
ENSURE GENERAL PPE TRAINING IS CARRIED OUT WITH UNTRAINED PERSONNEL BEFORE ASSIGNING TASKS
-
IS GENERAL PPE BEING WORN BY ALL PERSONNEL WHERE REQUIRED?
-
LIST PERSONNEL INVOLVED, ITEMS NOT WORN & ACTIONS TAKEN
-
DO ANY TASKS FOR THIS SHIFT REQUIRE ADDITIONAL OR SPECIALISED PPE?
-
ARE THE RELEVANT PERSONNEL ADEQUATELY TRAINED IN THE SAFE USE OF THIS PPE?
-
CONTINUE WITH TASK
-
DOES A TRAINING TOOL EXIST FOR THIS ITEM/S OF PPE?
-
ENSURE THE RELEVANT PERSONNEL ARE ADEQUATELY TRAINED TO SAFELY USE THE ITEM/S OF PPE.
THE RISKS INVOLVED WITH THE TASKS ARE TO BE MADE CLEAR TO THE PERSONNEL -
DO NOT ATTEMPT TO CARRY OUT THIS TASK
CONTACT MASS DRILL & BLAST MANAGEMENT
SHIFT TASKS & PRIORITY DETAILS
-
ADD TASKS HERE
TASK
-
SELECT TASK TYPE
- PRODUCTION - DRILLING
- MAINTENANCE
- SERVICING
- SITE SET UP/ UPKEEP
- TRAVEL TO/FROM SITE
-
LIST DETAILS HERE: BY WHOM / PLANT #, WORK AREA / LOCATION
-
BY WHEN? (Expected Completion Time - Estimate)
-
ARE THE RELEVANT JHA's &/OR PROCEDURES AVAILABLE, HAVE THEY BEEN READ & UNDERSTOOD BY PERSONNEL DELEGATED TO TASKS?
-
ENSURE PERSONNEL HAVE READ & UNDERSTAND THE RELEVANT DOCUMENTS, THEY MUST SIGN OFF ALSO BEFORE CARRYING OUT TASKS
-
IS ANY ADDITIONAL TRAINING REQUIRED BEFORE THE TASKS ARE CARRIED OUT?
-
ENSURE ALL RELEVANT TRAINING HAS BEEN COMPLETED TO MINIMISE THE RISKS OF INJURY &/OR DAMAGE TO PLANT
PERSONNEL SIGN OFF STATING UNDERSTANDING OF INFORMATION GIVEN
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature