Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Job Number
Site Details
-
Date
-
Time on site
-
Time off site
-
Work being carried out?
-
Work being carried out?
Enclosure Details
-
Photo of Enclosure
-
Photo of Airlocks
-
CCTV cameras or viewing panels used as per POW/MS
-
Smoke test carried out?
-
Supervisors signature to confirm enclosure has passed a smoke test.
-
Signature of witness of smoke test
Morning Enclosure Checks
-
General integrity of enclosure
-
Airlock/baglock - Clean, flaps in place, buckets/sprays
-
Signs - Airlock warning signs, transit route.
-
Fibre suppression equipment in place - Red box, hand sprays.
-
Supplies of wet strip solution on site
-
All suppression equipment working and ready to use
Afternoon Enclosure Checks
-
General integrity of enclosure
-
Airlock/baglock - Clean, flaps in place, buckets/sprays
-
Signs - Airlock warning signs, transit route.
-
Fibre suppression equipment in place - Red box, hand sprays.
-
Supplies of wet strip solution on site
-
All suppression equipment working and ready to use
RPE Checks
-
RPE's have been thoroughly checked by assigned users to ensure;<br>mask is clean<br>filter and motor are fitted correctly<br>valves and 'o' rings are in good condition <br>face piece has no holes<br>head straps are correctly fitted<br>battery has sufficient charge by carrying out flow test (for powered RPE)
-
Morning mask checks
-
RPE checks carried out
-
Time of checks
-
RPE checks carried out
-
Time of checks
-
RPE checks carried out
-
Time of checks
-
RPE checks carried out
-
Time of checks
-
RPE checks carried out
-
Time of checks
-
Afternoon mask checks
-
RPE checks carried out
-
Time of checks
-
RPE checks carried out
-
Time of checks
-
RPE checks carried out
-
Time of checks
-
RPE checks carried out
-
Time of checks
-
RPE checks carried out
-
Time of checks
Plant Checks
-
Negative Pressure Unit
-
NPU checked and is working correctly?
-
Morning morning checks
-
Afternoon NPU checks
-
ID/Reference numbers of NPU and manometer reading at start of shift
-
Vacuums
-
Vacuums checked and working correctly?
-
Morning vacuum checks
-
Afternoon vacuum checks
-
ID/Reference numbers of all vacuums on site
DCU Checks
-
Photo of DCU
-
Drain and filter connected?
-
Water tank/hose connected?
-
Power connected with RCD fitted. Earth rod?
-
Showers working and temperature of water correct?
-
Towels, shower gel, shampoo and nail brushes in place?
-
CO alarm tested?
-
Unit clean and ready for use?
-
All DCU checks carried out
Site Clearance Checks
-
All tape removed from enclosure construction?
-
All plant and equipment visually clean and no visual damage?
-
DCU clean and air test displayed ready for next use?
-
Area handed back to client and copy of four stage clearance left on site (if applicable)?
Supervisor daily checks completed by;
-
All checks above have been carried out and completed