Title Page
-
Foreman & Job Number
-
Safety Representative
-
Date (Clock In)
-
Date (Clock Out)
-
Location
-
Weather
-
Scope Of Work
1.0 Workplace
-
1.1 - Code 753 (Mark Outs)
-
1.2 - Competent Person
2.0 Administrative
-
2.1 - Documentation of Job Briefing
-
2.2 - HASP On-Site & Current
-
2.3 - Air Monitor In Use, Calibrated, Current & Readings Documented
-
2.4 - Current Permits Posted & Visible
-
2.5 - Burn Gel In Truck & Within Expiration
-
2.6 - First Aid Kit/Blood Bourne Pathogen Kit On-Site & Current
-
2.7 - Spill Kit On-Site
-
2.8 - Fire Extinguisher Visible, Current, & Immediately Available
3.0 Work Area Protection /PPE
-
3.1 - Flagger Present
-
3.2 - Barricades/Cones/Stanchions Complete & In Compliance
-
3.3 - MUTCD Signs In Use Where Required
-
3.4 - Arrow Board Operating & In Use When Applicable
-
3.5 - Pedestrians Provided With a Safe & Clear Path Of Travel
-
3.6 - Plates Pinned, Ramped, Flush, Skid Resistant, & In Complete Compliance
-
3.7 - Slings & Chains In Good Condition
-
3.8 - Rubber Electrical Gloves (KV) Dated With Expiration Date
-
3.9 - Proper PPE In Use When Required
-
3.10 - Fall Protection Where Required
-
3.11 - Wheels Chocked When Truck On Standby (Driver Not In Cab)
-
3.12 - All Tools In Good Condition
-
3.13 - Compressor Check Valves/Whip Checks In Place
-
3.14 - Housekeeping In Place On-Site & In Trucks To Prevent Slips, Trips & Falls
4.0 Excavation
-
4.1 - Spoils & Equipment 2' Away From Excavation
-
4.2 - Gas Monitoring Where Required
-
4.3 - Ladders Used At 4' Depth Or Greater & Extending 3' Above Landing
-
4.4 - Ladders In Place Every 25' Of Lateral Travel
-
4.5 - Shoring/Sheeting At 4'6" Or Greater Or When Required
-
4.6 - Daily Excavation Inspection Conducted
-
Notes/Other:
Sign Off
-
CP Signature (Clock In/Out)