Job Site Name

  • Job Site Name

  • Date

  • Site Supervisor

  • Time start

  • Prepared by

Requirements

Requirements

  • Emergency Phone Numbers Posted, Map to Emergency Medical, Oregon Required Postings.

  • First Aid supplies check Quanities

  • Eye wash station checked monthly

  • Water on Site

  • SDS Sheets on site or on a Company APP.

PPE

  • Hard hats worn if required

  • Hearing protection if reqiured

  • Safety harness used if required

  • Safety glasses worn if required

  • Respirator worn if Required

House Keeping

  • Walkways and stairs clear of debris and materials

  • Restrooms clean

  • No Smoking Signs if needed

  • Rebar capped

Fire protection

  • Fire fighting equipment placed around site, tagged monthly one for every 3000 SQ FT.

  • Fire Extinguisher at each Staircase on 2nd Floor and Higher

  • Fire fighting equipment marked and accessible

Electrical

  • Temp lights have bulb guards

  • Sufficient lighting

  • Lockout/Tagout used if required.

  • All cords and tolls have ground prongs

  • GFCI on all cords used outdoors

  • No Black Tape Repairs or Wires Showing

Tools

  • Power tool cords and plugs in good condition

  • Power tools have guards

Ladders

  • Straight ladders extended over 36 inches above landing

  • Straight ladders have feet or blocked at bottom

  • Straight ladders setup with a slope of 4 to 1

  • Straight ladders secured at Top to Prevent Movement

  • Ladders free of damage

Scaffolds

  • Scaffolding fully planked

  • Scaffolding braced correctly

  • Workers prohibited from riding on rolling scaffolding

  • Sill plates used on scaffolding outdoors

  • Fall protection used on scaffolding above 10 feet

Boom and Scissor

  • Workers trained to operate

  • Scissor entry chain or gate closed

  • Machines Uses on Solid Ground

  • Workers wearing harness in boom lift

Hand Rails and Covers

  • Floor holes over 2 inches are covered and labeled

  • Windows Openings have braces set between 39 and 45 inches

  • Door and Window Openings Have top brace at 39-45 inches and Doors have a mid brace at 21 inches

  • Openings over 19 inches Wide have bracing to prevent falls

  • Toe boards present if needed

  • Safety bracing will withstand 200 pounds of force in outward direction

  • Safety Braces have an Upright every 8 feet per OSHA

Trench and Excavation

  • Workers stay within shored area

  • Excavation spoil stored 2 feet back from trench edge

  • Soil Piles in the adjacent area don't exceed 2 feet in height (The adjacent Area is equal to the depth of the trench)

  • Shore boxes above or level with surface

  • Ladder in trenches over 4 feet deep per OSHA

  • Excavation 5ft or deeper shored per OSHA standard

  • Competent person present ( Ask Workers if they know who it is)

Silica

  • Cutting wet present

  • Vacuum 90% effective if used for silica

  • Respirators used when required by the task per OSHA

Forklift

  • Forklift in good condition

  • Forklift Attended when load in the air.

  • The seatbelt is used per OSHA requirements

  • Operators manual in forklift

  • Load chart legible

Summary

  • Summary

undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.