Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Safety
-
Are walkways kept clear of obstructions (exit, fire extinguisher, electrical boxes, cables etc)
-
Are floor areas clean, dry and free from slip hazards
-
Are hazardous materials stored in locked storage, silicone spray,silicone,acetone
-
Safety warnings (static warning, hot surface etc) posted properly
-
Are all safety hazards properly addressed (no pinch points, trip/slip hazards, machines properly guarded, adequate lighting for work spaces)
-
Proper PPE being worn/tested
Quality
-
SW documents upto date and reflects current state with ISO form number assigned and listed on form.
-
All equipment properly tagged and calibration current?
-
All torque guns tagged, torque calibration current, and in good condition
-
Have all air tools Been lubricated and stored away
-
ESD PPE being worn properly and checked/documented
-
Are ESD bins and mats being used and working properly?
-
SQDIP posted and upto date (Letter, Graph, Action Plan)
-
Scorecard is being maintained
-
Job instructions upto date and reflects current state
-
PM current and log maintained for last 6 months minimum
5S
-
Fixtures & benches clean and tidy (free of dirt and dust)
-
Floor tape in place and clean
-
Frequently used items on top of workspace at point of use, less frequently used items properly stored
-
Non-stationary items labeled/shadow boxed at location (tools, chemicals, etc)
-
All chemicals properly labeled and not expired?
-
Extra/empty bins removed from cell, excess supplies put back in home location
-
Have all hand tools been stored away
Kanban
-
Point of use inventory (surrounding the cell layout, except VMI)
-
Inventory containers/locations labeled - shelf and bin labels
-
KB cards on all parts w/part #, description, and KB quantity (unless KB card turned in)
-
KB trigger performance - if bag is open card should be turned in
-
(DSC Only) cards on past due peg should be less than one day late