Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
D&C Account Manager
- Nicole Dwyer
- Gary Poechhacker
- Emma Foster
- Darren Mifsud
- Andrew La sala
-
D&C Designer
- Kenny Lau
- Emma Foster
- Andrew La sala
-
Project Manager
- Tony El-Hasrouny - 0412 872 618 - tony@dcip.com.au
- Darren Mifsud - 0423 936 147 - darren@dcip.com.au
- Gary Poechhacker - 0404 499 910 - gary@dcip.com.au
- Matthew Lepar - 0423 053 319 - matthew@dcip.com.au
-
Requested handover date
-
Project Address
Certification Requirements
-
Is the site Heritage Listed?
-
If the site is Heritage listed a DA is required (approx 6 weeks). If the client is requiring a Liquor license a DA is required. A CDC will suit most other applications (for further info please contact Heath and Modern Building)
-
Are there any "AS BUILT" documents required for this project during handover?
-
Have we checked the Fire Egress is less than 20metres?
Engineer Report
-
Does this building, site or client require Engineer Reports?
-
There are some sites that require Building Engineer Reports. eg, Investa - LSIM Report, Chifley - Engineer Reports
Type of Fitout
-
Click the type of works that are to be completed on this project.
- Speculative Fitout
- Leasing Agent Lead
- Commercial Client
- Makegood
- Office Furniture Only
- Variation
Building Works
-
Is there a demolition required for site?
-
If YES to demolition, please supply a demo plan to the builders.
-
List all of the items below that are required to be demo'd and removed from site.
-
Photograph items that are to remain on sites
Ceiling
-
Is there a requirement to replace any ceiling tiles?
-
Specify Quantity.
-
Is there a requirement for a set celing?
Walls
-
Is there a requirement to add Baffles or Sound Check above any new walls?
-
Please Specify ceiling height
-
The following walls are available: Floor toCeiling Gyprock; Half Glass (1000mm high Gyprock; Full Height Glass 10.38 Full Height Glass 12.00 Full Height Glass (Double Glazed)
Skirting and Trims
-
Is there a requirement for Ducted Skirting?
-
Please specify if is is Standard Anodised or Powdercoat finish required
Doors
-
Select Door Type
- MDF Doors
- Aluminium Framed Glass doors
- Frameless Glass Doors
- Glass Sliding Doors
- MDF Sliding Doors
- Cavity Doors
-
Select Handle Type
- Standard (Non Lockable)
- Standard (Lockable)
- Large Handle
- Special Design
- Match existing
Kitchen
-
Please Specify the materials and Requirements for this Kitchen
- Laminated Benchtop
- Ravine Benchtop
- Stone Benchtop
- Melamine Doors
- Createc Gloss Doors
- Ravine Doors
- Timber Doors
- Glass Doors
- Overhead Cupboards
- Standard Handle
- Push Catch
- Recessed Handle
-
Please specify the Tap Hardware Required
- Single Bowl
- Double Bowl
- Zip Hot Water
- Pump Out Unit Required
- Billi Chilled and Hot Water Unit
-
Image / Photo
Hydraulics
-
What type of drainage system are we to use?
- Pump out unit
- Core Hole (Gravity)
-
What is the distance of the Hydraulic Riser?
-
Do we require a cavity behind storage units or wall to running plastic piping?
-
If yes to the above, please Specify the action required
-
Add media
Whitegoods
-
Please Specify what items are required for the kitchen
- Fridge (RHS Handle)
- Fridge (LHS Handle)
- Microwave
- Dishwasher
- Integrated Dishwasher
Painting / Wall Paper
-
Are we painting all walls? If no, please specify the walls that are NOT being painted.
-
Are any walls to be covered with wall paper?
-
Are there any feature walls?
-
Is there a set ceiling that requires painting?
-
Add media
Electrical
-
Is the lighting in this project to be replaced?
-
Please note how many Power and data outlets are required
-
Please Specify the amount of Data per workstation
-
-
Are we to run the phone lines from the riser to the rack unit?
-
Do we require extra exit signs / emergency lighting
-
Do we require Separate Light Switches for any rooms?
-
Do we require Data, Power and HDMI to the Boardroom Table?
-
Add media
-
Do we Require a Projector or TV's installed into Offices / Meeting Rooms?
-
Is there power required for Supplementary Mechanical Units (ie Supp Air, mechanical Blinds)
-
Please Specify the type of Security this site may require
- No Security Required
- Mag Lock with Pass
- Mag Lock with Pass and Computer Login
- Cameras
-
Do we require any Wifi points within the tenancy?
-
If so, please specify the quantity, location and type.
Air-conditioning
-
Do we require a supplementary Air Conditioning unit for any Rooms?
- Boardroom
- Meetingroom
- Comms Room
- Workstation Area
- Training Room
-
Are there any outlets that are required to be moved due to building works and/or lighting?
-
Add media
Fire Services
-
Are we to relocate / add extra sprinklers to this tenancy?
-
Do we require Extra EWIS speakers for this tenancy?
-
Add media
Flooring ( Vinyl , Carpet, Tiles )
-
Please Specify the type of Flooring Required
- Not replacing flooring
- Carpet Tiles Only
- Carpet Tiles and Vinyl Flooring
- Vinyl Flooring Only
- Tiles
- Timber Flooring
- Bolon Flooring
-
Are we to remove existing Carpet / Vinyl or Tiles
-
If YES to the above question, please specify how we intend to remove the carpet
-
Add media
Office Furniture
-
Please Specify the Number of Workstations
-
Please Specify the number of Closed Offices
-
Do we require Soft Wiring to all Workstations?
-
Please Specify what Type of Screen panel is required?
- 360h Desk Mounted
- 500h Desk Mounted
- 1200h Floor Based
- 1500h Floor Based
- 1800h Floor Based
-
What Type of Material are we using on the Workstations?
-
What Type of Material are we using on the Meeting / Boardroom Tables?
- 25mm Melamine
- 33mm Melamine
- 25mm Polytec Ravine
- 33mm Polytec Ravine
- 25mm Timber Veneer
- 33mm Timber Veneer
-
What Type of Edging is Required on the Boardroom Table / Meeting Tables?
- Straight Edge
- Custom Wood Sharknose
- Solid Sharknose
-
Add media
Operable Wall
-
Is there a requirement for an Operable Wall?
-
If so, Please Specify the Type
- Fabric
- Whiteboard
- Melamine
- Timber
Graphics
-
Have we allowed a 75mm (or 1000mm) band of frosting against all glazed panels?
-
Does the site require any special frosting. (if so, please specify)
-
Does this site require any Signage?
Other
-
Does this site require any Blinds or Screens?
-
Does this site require any Artwork?
-
Does this site require any Fabric Panels / Artwork?
-
Does this site require any Acoustic Panels?
-
Are all works to be completed in normal working hours?
-
If there are works to be completed outside normal working hours such as; Core Holes, Drilling into Concrete, Grinding of Flooring, Acceptance of Deliveries due to Clients Requests Please Specify the works below