FIRST FIX

1. CONDUIT/TRUNKING

  • 1.01 Support Brackets Adequate Studs Cut to Length and End caps Fitted ?

  • 1.02 Fixings Adequate?

  • 1.03. Complies with British Standards?

  • 1.04 Class, duty, IP rating correct?

  • 1.05 Adequate size for cables?

  • 1.06 All parts earthed?

  • 1.07 Free from burrs and sharp edges?

  • 1.08 Drainage holes / gaskets provided?

  • 1.09 Threads / cut ends painted?

  • 1.10 Inspection fittings accessible?

  • 1.11 Correct segregation Band I & II circuits?

  • 1.12 Securely fixed?

2. CABLE TRAY AND BASKET

  • 2.01 Continuous & adequately earthed?

  • 2.02 Joints mechanically sound?

  • 2.03 Correct segregation Band I & II circuits?

  • 2.04 Installation Methods Satisfactory?

  • 2.05 Suitable for installed environment?

  • 2.06 Support Brackets Adequate Studs Cut to Length and End caps Fitted ?

SECOND FIX

3. CABLE

  • 3.01 Complies with British Standards?

  • 3.02 Correct size, type, rating?

  • 3.03 Protected against mechanical damage ?

  • 3.04 Protected against abrasion?

  • 3.05 Suitably selected for conditions?

  • 3.06 Correctly installed / fixed?

  • 3.07 Non-sheathed cables in conduit/trunking ?

  • 3.08 Sheathed cables in allowed zones ?

  • 3.09 Internal sealing / fire barriers installed where required?

4. EARTHING AND BONDING

  • 4.01 Main earth terminal / bar correct

  • 4.02 Main protective bonding correct?

  • 4.03 Exposed conductive parts earthed?

  • 4.04 CPC at all accessories / equip.?

  • 4.05 Supplementary bonding checked?

5.0 DISTRIBUTION EQUIPMENT.

  • 5.01 Accessible, adequate working space?

  • 5.02 Size and rating adequate?

  • 5.03 Securely fixed, not damaged?

  • 5.04 Complete including schedules & labels?

THIRD FIX

6. CABLE

  • 6.01 Connections tight, all strands secured?

  • 6.02 Correctly identified/colour coded?

  • 6.03 Correct polarity?

  • 6.04 CPC's correctly connected?

  • 6.05 Heat sleeving applied where required?

7. GENERAL

  • 7.1 Accessories and equipment, fitted and connected

  • 7.2 Accessories and equipment free from damage?

  • 7.3 Accessible for operation,inspection and maintenance?

  • 7.4 All live parts adequately insulated?

  • 7.5 Barriers, enclosures, obstacles in place?

  • 7.6 Isolation & functional switching adequate?

  • 7.7 Protective device rating adequate?

  • 7.8 Labels, notices, markings correct?

  • 7.9 Diagrams, charts, instructions present?

  • 7.10 Lids & covers fitted?

  • 7.11 IP Rating Adequate?

  • 7.12 Electrical equipment rating adequate?

  • 7.13 Sealing & fire barriers adequate?

  • Inspected by

  • Witnessed by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. Any ratings or scores displayed in our Public Library have not been verified by SafetyCulture for accuracy. Users of our platform may provide a rating or score that is incorrect or misleading. You should independently determine whether the template is suitable for your circumstances. You can use our Public Library to search based on criteria such as industry and subject matter. Search results are based on their relevance to your search and other criteria. We may feature checklists based on subject matters we think may be of interest to our customers.