Title Page
-
Safety Inspection
-
Conducted on
-
Prepared by
-
Location
-
Competent Person
-
Permit number
-
Weather
1.0 Workplace
-
1.1-Code 753 (Mark Outs)
-
1.2-Inspector
-
1.3-Competent Person
2.0 Administrative
-
2.1-Documentation of Job Briefing
-
2.2-Certifications, Certificates of Fitness, & Training Cards
-
2.3-Air monitor in use & calibrated
-
2.4-Air Monitor log on-site
-
2.5-Current HASP on-site
-
2.6-Current permits posted & visible
-
2.7-Complete Job Package on-site
-
2.8-Noise Mitigation Plan on-site
-
2.9-Con Edison's rule book for MUTCD on-site
-
2.10-First Aid Kit/Blood Bourne Pathogen Kit on-site & current
-
2.11-Spill Kit on-site
-
2.12-Fire extinguisher visible, current, & immediately available
-
2.13-Complete contact list in HASP
-
2.14-Local hospital information in HASP
-
2.15-Safety Data Sheets in HASP (SDS's)
-
2.16- CEHSP 13.00 Excavation Procedures
-
2.17- Current RWLB matrix posted
-
2.19- Silica program in place
3.00 Work Area Protection
-
3.1- Flagger present with advanced warning signs
-
3.2- Barricades/Cones/Stanchions complete & in compliance
-
3.3- MUTCD signs in use where required
-
3.4 Arrow board operating & in use when applicable
-
3.5- Pedestrians provided with safe & clear path of travel
-
3.6- Plates Pinned, ramped, flush, skid resistant, & in complete compliance
-
3.7- Manhole guardrail in use when work is in progress in such areas
-
3.8- Slings & chains in good condition
-
3.9- KV Gloves dated & within expiration
-
3.10- Proper PPE in use when required
-
3.11- Vehicle’s engine turned off (Idling regulations)
-
3.12- Seat belts intact & in good condition
-
3.13- Wheels Chocked when truck on standby
-
3.14- Hydrants & bus stops clear
-
3.15- All tools in good shape
-
3.16- Adequate set-up
-
3.17- Housekeeping
4.00 Excavation
-
4.1- Spoils & equipment 2’ away from excavation
-
4.2- Gas monitoring where required
-
4.3- Ladders used at 4’ depth or greater and extending 3’ above landing
-
4.4- Ladders in place every 25’ of lateral travel
-
4.5- Shoring/sheeting when required
-
4.6- Daily excavation Inspection conducted
Sign off
-
On- site Representative
-
Auditor’s signature