Title Page

  • Safety Inspection

  • Conducted on

  • Prepared by

  • Location
  • Competent Person

  • Permit number

  • Weather

1.0 Workplace

  • 1.1-Code 753 (Mark Outs)

  • 1.2-Inspector

  • 1.3-Competent Person

2.0 Administrative

  • 2.1-Documentation of Job Briefing

  • 2.2-Certifications, Certificates of Fitness, & Training Cards

  • 2.3-Air monitor in use & calibrated

  • 2.4-Air Monitor log on-site

  • 2.5-Current HASP on-site

  • 2.6-Current permits posted & visible

  • 2.7-Complete Job Package on-site

  • 2.8-Noise Mitigation Plan on-site

  • 2.9-Con Edison's rule book for MUTCD on-site

  • 2.10-First Aid Kit/Blood Bourne Pathogen Kit on-site & current

  • 2.11-Spill Kit on-site

  • 2.12-Fire extinguisher visible, current, & immediately available

  • 2.13-Complete contact list in HASP

  • 2.14-Local hospital information in HASP

  • 2.15-Safety Data Sheets in HASP (SDS's)

  • 2.16- CEHSP 13.00 Excavation Procedures

  • 2.17- Current RWLB matrix posted

  • 2.19- Silica program in place

3.00 Work Area Protection

  • 3.1- Flagger present with advanced warning signs

  • 3.2- Barricades/Cones/Stanchions complete & in compliance

  • 3.3- MUTCD signs in use where required

  • 3.4 Arrow board operating & in use when applicable

  • 3.5- Pedestrians provided with safe & clear path of travel

  • 3.6- Plates Pinned, ramped, flush, skid resistant, & in complete compliance

  • 3.7- Manhole guardrail in use when work is in progress in such areas

  • 3.8- Slings & chains in good condition

  • 3.9- KV Gloves dated & within expiration

  • 3.10- Proper PPE in use when required

  • 3.11- Vehicle’s engine turned off (Idling regulations)

  • 3.12- Seat belts intact & in good condition

  • 3.13- Wheels Chocked when truck on standby

  • 3.14- Hydrants & bus stops clear

  • 3.15- All tools in good shape

  • 3.16- Adequate set-up

  • 3.17- Housekeeping

4.00 Excavation

  • 4.1- Spoils & equipment 2’ away from excavation

  • 4.2- Gas monitoring where required

  • 4.3- Ladders used at 4’ depth or greater and extending 3’ above landing

  • 4.4- Ladders in place every 25’ of lateral travel

  • 4.5- Shoring/sheeting when required

  • 4.6- Daily excavation Inspection conducted

Sign off

  • On- site Representative

  • Auditor’s signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.