Jobsite Safety Inspection

  • Jobsite Number & SI (Place SI after Job Number for Safety Inspection)

  • Conducted on

  • Prepared by

JOB START-UP

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Postings (Federal & Danis All-In-One, Gun Poster, No Smoking)

  • First Aid Kit hung and Crisis Management Plan Posted

  • Emergency Action Poster up with appropriate contact numbers?

  • Notification System in place and Rally Point designated.

  • Competent Persons List Posted for Contractors on site.

GENERAL SAFETY, OCCUPATIONAL HEALTH AND ENVIRONMENTAL CONTROLS

  • INSPECTING ITEMES RELATED TO THIS SECTION?

  • Preconstruction safety meetings are conducted

  • Safety plans are up-to-date.

  • Sub's documentation (toolbox talks, inspections, MSDS on site, etc.)

  • Morning huddles are conducted and documented.

  • Stretch & Flex is performed on a daily basis.

  • Housekeeping is in good order.

  • Exits Unobstructed / Emergency Exit Signs are in place (as applicable)

  • First Aid Kit / Eyewash Replenished

  • First Aid / CPR trained employee is on site.

  • An adequate supply of potable (drinking) water is available.

  • Toilet Facilities (clean) (1 toilet per 20 workers)

  • Hazardous chemicals are labeled properly (fuel tank storage placards, form oil, curing compound, etc.)

  • Public Protection (fencing, walkways, signage, lighting)

  • Other (please specify)

PERSONAL PROTECTIVE EQUIPMENT

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Hard Hats

  • Foot protection

  • Eye / Face Protection

  • Hearing Protection

  • Respiratory Protection

  • Hand Protection

  • Protective Clothing (High Viz, welding jacket, etc.)

  • Other (please specify)

FIRE PROTECTION & PREVENTION

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Fire Extinguisher - Is monthly inspection Current?

PLEASE COMPLETE FIRE EXTINGUISHER CHECKLIST ASAP.

  • Fire Extinguishers observed in good condition?

  • One 2A FE every 3000 sq ft, not exceeding 100 ft of travel

  • Fire Extinguisher at every Stairwell?

  • Flammable/Combustible Liquids Stored Properly (safety cans, storage tanks - double walled/spill containment and protected)

  • Hot Work (Fire Watch, Fire Blankets, Hot Work Permit, Extinguisher Present, Debris Cleared)

  • Other (please specify)

TOOLS - HAND & POWER

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Tools in good shape and used properly.

  • Guards installed on power tools.

  • Power tools properly grounded or double insulated.

  • Powder-actuated tools used per OSHA guidelines.

  • Laser signs posted in proper locations. (if needed)

  • Other (please specify)

WELDING & TORCH CUTTING

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Hot Work Permit Required?

  • Permit completed and posted by work.

  • Existing Fire Alarm/System Addressed

  • Proper people notified of work?

  • Fire Watch in place per permit?

  • Proper Fire Suppression in place per permit?

  • Hot work doesn't create hazard for other workers.

  • Suitable Hot Work PPE.

  • Additional Fire Extinguisher in place.

  • Welding Operations?

  • Welding cables/connectors insulated and flexible.

  • Welding cables free from repair or splices w/in 10' of cable end.

  • Welding curtains in place. (if applicable)

  • Proper ventilation is provided.

  • Torch Cutting Operations?

  • Compressed gas cylinders stored properly. (upright, secured, capped, 20' apart)

  • Backflow preventers installed by torch guages.

  • Gauges removed at end-of-day/when not-in-use?

  • Other (please specify)

ELECTRICAL

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • GFCI (at breakers, outlets, pigtails)

  • GFCIs regularly inspected by Electrician?

  • Live parts guarded from employee contact.

  • Temporary Lighting In Use?

  • Hung properly - manufactured hanger/non-conductive material

  • Bulbs Protected not broken/missing

  • Powered by independent circuit.

  • Electrical Cords in good condition & not a trip hazard

  • Electrical Cords - hung w/ non-conductive material, out of water.

  • Energizedl Panel - Dead Front & Cover Installed

  • Energized Panel - Blank installed for missing breakers

  • Lock Out / Tag Out currently used?

  • Lock in place with proper tag.

  • Owner Documentation completed (if applicable)

  • Multiple subcontractors involved?

  • Other (please specify)

SCAFFOLDS

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Competent Person supervised Erection?

  • Competent Person on site?

  • Tagged and inspected by Competent Person?

  • Base (sills/plates/jacks/casters - secured/level)

  • Frames (compatible, pinned, plumb/square, condition)

  • Base (sills/plates/jacks/casters - secured/level)

  • Platforms (fully planked, secure/proper overhang, condition)

  • Access (ladder - attached/integrated in frame)

  • Secured to Structure/Outriggers in place

  • Guardrails, Toeboards, Personal Fall Prot.

  • Mobile Scaffolds in use?

  • Diagonal "Gooser" Bar

  • Casters / Wheels Locked

  • Stilts in use?

  • Flat surface, no holes/debris/trip hazards

  • Guardrails extended (if applicable)

  • Other (please specify)

FALL PROTECTION

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Wearing Personal Fall Protection?

  • Attached to 5000 lb Anchor Point (min)

  • Rescue Plan in Place

  • Properly wearing Harness

  • Full system in good shape

  • Guardrails in use?

  • Toprail 42" +/- 3", Midrail, Toeboard

  • Flagged every 6' (wire rope)

  • Stanchions - Secure, </= 8' (wood system)

  • Falling Object Protection (Canopy, Barriers)

  • Hole Covers (2 x max load, secure, high viz)

  • Warning Lines (6' roofers, 15' other trades)

  • Other (please specify)

CRANES, DERRICKS, HOISTS, ELEVATORS & CONVEYORS

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Inspections (Daily, Annual)

  • Windows free from damage

  • Set-up (Level, Barricaded, tires off ground)

  • Outriggers (full extension, pads adequate & level)

  • Power Lines in reach?

  • Are Power Lines De-energized

  • Select Voltage & Distance

  • Proper Distances Maintained?

  • Spotter/Warning System in place

  • Anti-two Block System

  • Fire Extinguisher in cab.

  • Operation (load path, taglines, signal person)

  • Workers clear of load path/suspended.

  • Capacity (Charts available, Critical Lift Plan, Weights know)

  • Sling Condition (wire rope, synthetic, hardware)

  • Operator (controlled & safe)

  • Other (please specify)

EXCAVATIONS

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Utility Locates Performed (811)

  • Egress - 4' or greater (25' of travel)

  • Air Monitoring (sewer tie-in, possible hazardous atmosphere)

  • Spoils/Material/Equip. 2' from edge

  • Competent Person - Performed Daily Inspection

  • Trench/Excavation over 5'

  • Protective System in place.

  • Type of System

  • What is slope?

REMOVE WORKERS TO SAFE AREA UNTIL A SAFE SYSTEM IS IN PLACE!

  • Employees trained in trenching/excavation

  • Excavation Barricaded (if applicable)

  • Other (please specify)

CONCRETE & MASONRY

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Impalement Hazards Protected (rebar, D-pins)

  • Silica Exposure (wet cutting, respirator for mixing, grinding, cutting)

  • PPE for Cement (Safety Glasses, Rubber Gloves, Rubber Boots)

  • Hygiene For Cement (Neutralite, Paper Towels, 15 min Eyewash)

  • Temporary Heat

  • Combustibles away from heat source

  • Air Quality Maintained

  • Compressed Gas stored properly.

  • Structural Masonry Operation?

  • Over 8' adequately braced.

  • Proper anchorage

  • Controlled Access Zone (wall height + 4')

  • Precast/Tilt-up Panels

  • Adequate Pipe Bracing.

  • Proper Anchorage

  • Controlled Access Zone (wall height + 4')

  • Other (please specify)

STAIRWAYS & LADDERS

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Stair or ladder provided for 19" or > change in elevation

  • Ladders?

  • Danis Ladders Inspected (inspection sticker)

  • Extension Ladders 3' above landing.

  • Extension Ladder Secured at Top (min)

  • Extension Ladder set-up 4:1 ratio

  • Off-set corral in place

  • Access areas kept clear.

  • Set on Stable Surfaces

  • Step Ladders fully open (spreaders locked)

  • Top Two Steps not used (step ladder)

  • Job-Built Ladders meet ANSI Standard

  • Stairs?

  • Treads filled solid with concrete or wood.

  • Hand Rails (min 36" above tread, continuous grab)

  • Fall Protection both sides

  • Other (please specify)

MOBILE EQUIPMENT

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Daily Inspection(s) Performed

  • Operator performing in a safe manor.

  • Seatbelt worn during operation.

  • ROPS - in place, defect free

  • Back-up Alarm(s) working.

  • Aerial Lift (Fall Protection, Operator Trained)

  • Scissor Lift (Safety Chain Used, Fall Protection when above platform)

  • Other (please specify)

  • Enter Auditor's Name and Signature.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.