Information
-
Engineer
-
Call Implementation Coordinator to confirm start.
-
Site Address
-
ATM ID
ATM Details and pre install checks.
-
Device
- 6626
- 6634
- 6622E
- 6622RL
- 6622FL
- 6625
- 6684
-
Confirm Unit has been balanced and De-Cashed
-
Enter Device Serial Number
-
EPP Serial Number
-
Is serial same as documentation. Update Tietoevery if different
-
Cheque Processor and Journal Printer Disconnected
-
Serial of PC Core Out
-
HDD OUT
-
HDD IN
-
Serial of PC Core In
-
Device Cabling Completed
-
BIOS time and date correct?
-
TPM Cleared
Software Build
-
Build Start Time
-
Customer Profile Entered
-
TCP/IP Settings Entered
-
Terminal Config Entered
-
Build Complete Time
Sign Off
Configuration details and checks
-
GOP Calibrated
-
Cust Screen Calibrated And Checked
-
Printer Set to Black Mark in From Length
-
Dispenser Authorized
-
Deposit Unit Authorized
Hardware
-
Printer Checked
-
Card Reader checked
-
Dispenser Checked
-
Cassettes Re-Configured Dispense
-
Cassettes Configuration Checked. Print Configuration from Supervisor Menu and Photograph
Media
-
All Photos
-
Call Implementation Coordinator to Confirm Completion
-
Sign Off On Your Work