Title Page
-
Conducted on
-
Prepared by
-
Location
-
Job number
-
Has the job been completed to BG standards
-
Picture of boiler
-
Picture of flue inside
-
Picture of flue outside
-
Picture of making good
-
Picture of condensate route/ connection
-
Picture of airing cupboard
-
Picture of gas meter
-
Have all ASP refunds been completed if needed?
-
Picture of the boiler IQ readings page
-
Has all the compliance paperwork been completed?
-
Has payment been taken?
-
Is the customer Happy?
-
Have you organised the post call?
-
Engineer signature
-
Add signature
-
Select date