Information

  • Document No.

  • Conducted on

AUDIT INFO

  • Part Number

  • Print Revision

  • Dept / Area

  • Shift

  • Auditor

AUDIT DATA

  • Emboss - Requirement

  • Emboss - Actual

  • Emboss Pass / Fail ?

  • Part Label - Requirement

  • Part Label - Actual

  • Part Label Pass / Fail?

  • Tube Sizing (ID, OD, Depth, Slots, Indents) - Requirement

  • Tube Sizing - Actual

  • Tube Sizing Pass / Fail?

  • Weld Wire Type - Requirement

  • Weld Wire Type - Actual

  • Weld Wire Type Pass / Fail?

  • Weld Quality Pass / Fail?

  • Obvious Defects (Dents, Scratches, Burrs, Nicks, Rust, Cleanliness) Pass / Fail?

  • First Piece Sign Off Sheet Completed?

  • First Piece Sheet Signed?

  • Tooling is in good working condition?

  • Tooling matches Route Sheet?

  • Part is acceptable dimensionally?

AUDIT MISC

  • Team Leader Signature

  • Supervisor Signature

  • QC Inspector Signature

  • Is follow-up required?

  • Tap to enter information
  • Open Date

  • Close Date

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.