Title Page

  • Client

  • Site

  • Location
  • Conducted on

  • Inspected by

Route Description

  • Aggregation Zones

  • Route Start

  • Route End

  • DCP Test
  • DCP Test number

  • Soil Type

  • Trench Depth

  • Area Tested

  • Number of blows (3/5)

  • Number of blows (6/10)

  • Number of blows (9/15) Stop at 300 mm

  • Number of blows (20) 450mm Trench

  • Number of blows (25)

  • Number of blows (30) Stop at 800mm

  • 900mm Trench

  • Area Tested

  • Number of blows (3/5)

  • Number of blows (6/10)

  • Number of blows (9/15) Stop at 300mm

  • Number of blows (20) 450mm Trench

  • Number of blows (25)

  • Number of blows (30) Stop at 800mm

  • 900mm Trench

  • Variance is calculated as follows:
    Virgin divided by Trench minus 1, Please note Variance cannot be greater than -0.15

  • Test Max variance

Test Completed

  • Test 1

  • Test 2

  • Test 3

  • Test 4

  • Test 5

  • Test 6

Completion

  • I the undersigned, (duly authorized) herewith confirm that the above tests performed for the above link was successful and I will be held liable for any false information given above and be accountable for all costs incurred upon rectification.

  • Full Name and Signature of Competent Person

  • Full Name and Signature of Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.