Title Page
-
Client
-
Site
-
Location
-
Conducted on
-
Inspected by
Route Description
-
Aggregation Zones
-
Route Start
-
Route End
DCP Test
-
DCP Test number
- 1
- 2
- 3
- 4
- 5
- 6
-
Soil Type
-
Trench Depth
-
Area Tested
-
Number of blows (3/5)
-
Number of blows (6/10)
-
Number of blows (9/15) Stop at 300 mm
-
Number of blows (20) 450mm Trench
-
Number of blows (25)
-
Number of blows (30) Stop at 800mm
-
900mm Trench
-
Area Tested
-
Number of blows (3/5)
-
Number of blows (6/10)
-
Number of blows (9/15) Stop at 300mm
-
Number of blows (20) 450mm Trench
-
Number of blows (25)
-
Number of blows (30) Stop at 800mm
-
900mm Trench
-
Variance is calculated as follows:
Virgin divided by Trench minus 1, Please note Variance cannot be greater than -0.15 -
Test Max variance
Test Completed
-
Test 1
-
Test 2
-
Test 3
-
Test 4
-
Test 5
-
Test 6
Completion
-
I the undersigned, (duly authorized) herewith confirm that the above tests performed for the above link was successful and I will be held liable for any false information given above and be accountable for all costs incurred upon rectification.
-
Full Name and Signature of Competent Person
-
Full Name and Signature of Inspector