Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Cooling towers

  • Equipment functionality

  • Visual inspection

  • Stock levels adequate

  • Tower 2 conductivity

  • Tower 3 conductivity

  • Tower 4 conductivity

  • Tower 7 conductivity

  • Tower 5 conductivity

  • Tower 2 dipslide <10-4 cfu/ml

  • Tower 5 dipslide <10-4 cfu/ml

  • Tower 3 dipslide <10-4 cfu/ml

  • Tower 4 dipslide <10-4 cfu/ml

  • Tower 7 dipslide <10-4 cfu/ml

  • U97 soft supply ok?

  • Cold store soft supply ok?

Chlorine dioxide

  • Water meter reading m3

  • Chlorine dioxide ppm

  • Adequate stock?

  • Equipment visual inspection

Oven RO and soft supply quality

  • U97 soft water quality ok?<br>

  • U97 RO conductivity (<20us)

  • U3 soft water quality ok?<br>

  • U3 RO conductivity (<20us)

  • U5 soft water quality ok?<br>

  • U5 RO conductivity (<20us)

Steam boilers

  • TDS autoblowdowns function correctly?

  • No.1 TDS ppm

  • No.2 TDS ppm

  • No1 sulphite ppm

  • No2 sulphite ppm

  • No1 caustic alkalinity ppm

  • No2 caustic alkalinity ppm

  • Comments and observations

Comments

  • Comments on general conditions and operations

  • Actions required

  • Completed by

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.