SAFETY DAILY INSPECTION REPORT
Location
-
Project title
- Al Maather
- Al Hazem
- Al Waha
- Hindawiah
- Khuzam
- 69 KV Dammam
- Al Khatam
- Al Lith
- Bawat
- Murjan
- Taima Tabuk
-
Contract no.
- Al Maather
- Al Hazem
- Al Waha
- Hindawiah
- Khuzam
- 69 KV Dammam
- Al Khatam
- Al Lith
- Bawat
- Murjan
- Taima Tabuk
-
Weather
- Al Maather
- Al Hazem
- Al Waha
- Hindawiah
- Khuzam
- 69 KV Dammam
- Al Khatam
- Al Lith
- Bawat
- Murjan
- Taima Tabuk
-
Select date
Checks
-
1 Housekeeping
-
2. Compressed gas
-
3. Concrete construction
-
4. Confined space
-
5. Electrical
-
6. Excavation
-
7. Fire protection
-
1 Housekeeping
-
1 Housekeeping
-
1 Housekeeping
-
1 Housekeeping
-
1 Housekeeping
-
1 Housekeeping
-
1 Housekeeping
-
1 Housekeeping
-
1 Housekeeping
-
1 Housekeeping
Manpower Status
-
CONTRACTOR
-
SUBCONTRACTOR
-
PLANT AND EQUIPMENT
-
What are the equipment used?
- Excavator
- Dump truck
- Roller compactor
- Pick up
- Mobile crane
- Skid steer
- Generator
- Pay loader
- Power tools
-
SITE ACTIVITIES
-
Civil works
- Preparation of site office and safety works
- Mobilization of materials
- Marking
- Installation of safety barriers/lighting/Signages at site
- Excavation and shoring
- Asphalt cutting
- Setting of cable winch
- Cable pulling
- Backfilling
- Asphalt works
- Traffic control/housekeeping
-
Electrical works
- Cable jointing
- Termination
-
Submitted by: Safety Engineer/Officer
- Allan Rey Rizalde
- Ryan Cabarlo
- Michael Dave Herrero
- Darwin Llantada
- Charlie Villanueva
- Charles Subong
- Rainerio Bacon
- Bryle Cyril Besinga
- Bahar Ali Muhammad
- Aju Thomas
- Amal Koodaly
- Sindarth Khrisnan
- Archie Pulmano
- Lagayan, Jaafar
-