Title Page
-
Conducted on
-
Prepared by
-
Location
Job Inspection
-
Audit Date:
-
Customer:
-
Lease Name:
-
Job Start Date:
-
Completion Date:
-
Enviro Score:
- Compliant
- Non-Compliant
- N/A
-
Frac Stage:
-
Notes:
-
Job Manager:
-
Job Supervisor:
-
# of Employees:
-
Auditor:
-
# of SSE:
-
Sub-Contractor:
-
SSE Mentor(s):
-
Safety
-
JSA Satisfactory:
-
Crew Condition:
-
PPE Applied:
-
Weather Conditions:
-
Tools/Equip:
-
Excavation Work:
-
Fall Protection:
-
Electrical Connections / Trailer & Equip:
- Level1 - OK to use as is
- Level 2 - OK to use but needs to be addressed after job
- Level 3 - Needs to be repaired prior to leaving job site
- Level 4 - Unsafe to use
-
Water Safety:
-
Respiratory:
-
Lockout/Tagout:
-
Fire Safety:
-
Sim Ops:
-
Combustibles:
-
Housekeeping / Site Conditions:
-
Safety Notes:
-
Environmental
-
Fluid Being Transferred:
-
Other Fluid on Location:
-
Pumps in Containment:
-
Secondary Containment:
-
Leaks / Spills:
-
# of Pumps:
-
# of Heaters:
-
Standby Pump Rigged Up:
-
Condition of Equipment:
-
Trucks onsite:
-
Cargo Securement:
-
DVIR Performed:
-
Assets accounted for:
-
Notes:
Frac Tanks
-
# of Fresh Water Tanks:
-
# of Working Tanks:
-
# of Acid Tanks:
-
Leaks Observed:
-
Hoses Secured to Tanks:
-
Containment Secure:
-
Spills to Date:
-
Tank Floats Functioning:
-
Tank Levels Adequate:
-
Procedures Followed:
-
Evidence of Overflow:
Poly Pipe/Water line
-
Linear Feet Used:
-
Freshwater Leaks:
-
Leaks Detected:
-
Damaged Pipe or Hose:
-
Road Crossings taken care of:
-
Pipe Properly Braced:
-
Re-Circulation Line Secure:
-
Trash & Debris Observed:
-
Notes / Challenges:
-
Photo
-
Photo
-
Photo
-
Photo
-
Photo
-
Photo