Title Page
-
Audit Title
General Health & Safety
-
Conducted on
-
Prepared by
-
Location
-
Client / Site
-
Site Manager/Supervisor
Introduction
Site General Information
-
-
Work in Progress
- Demolition
- Soft Strip
- Partial Demolion
- Groundworks
- Construction
- Asbestos Removal
- Industrial Dismantling & Demolition
- Large Scale Earthworks
-
Structure type
- Tower Block
- Stressed Concrete Structure
- Reinforced Concrete Structure
- Chimney
- Bridge
- Gas Structure
- Shoring & Facade Retention
- Site Clearance & Remediation
- Steel Framed, Brick Infil
- Muckshift
-
How many floors does the structure have?
- 1
- 2
- 3
- 4
- 5
- more than 5
- N/A
-
Location Type
- City Centre
- Industrial
- Commercial
- Residential
- Rural
- Urban
-
How many people are on site
Site Entrance
-
Site Entrance
-
Clear signage displayed at entrance?
-
Access/Site secure?
Principal Contractor under CDM
-
Principal Contractor under CDM
-
Name of PC:
Temporary Works
-
Is There Temporary Works on Site?
-
Is there a Temporary Works Register in place
-
Name of Temporary Works Coordinator
-
Name of Temporary Works Supervisor
-
List temporary works on site.
1.0 Welfare/Site Set Up
-
1.2 Toilets/Showers
-
1.3 Canteen/Mess Room
-
1.4 Drying Room & Storage for clothing/PPE/Change of clothes
-
1.5 Office & Meeting Room
-
1.6 Pedestrian Segregation
-
Add media
-
1.7 Preparation of Hot Food/Drinks
-
Has electrical equipment been PAT tested?
-
1.8 Health & Safety information signage displayed in welfare units?
-
Welfare/Site Set Up observations
2.0 Documents
-
2.1 F10
-
Photo
-
Photo
-
2.2 Section 80/81
-
Photo
-
2.3 HSE Poster
-
HSE poster
-
2.4 Policies, signed & current
-
H&S Policy
-
2.5 Site Plan
-
Site plan
-
2.6 Insurance Certificate
-
Insurance
-
2.7 Is there access to Training Records on site?
-
How?
-
2.8 What is the Qualification level of the Site Supervisor?
-
2.9 Is there a means of reading CCDO Smart Cards on site? This is for information gathering only, no scoring attached.
- Yes
- No
- N/A
-
2.10 Is there a COSHH Register on Site ?
-
2.11 Is there COSHH Assessments on site?
-
Document observations
3.0 Task Sheets
-
3.1 Is there a Construction Phase Plan <br>In place, suitably developed for the works?
-
3.2 RAMS<br>Are they suitable & sufficient for the tasks?
-
3.2.1 Have all operatives signed off on the relevant MS
-
3.2.2 Has a morning briefing taken place (information via on site operative)
-
3.3 Is there a Refurbishment/Demolition Survey on site?
-
Asbestos Survey
-
3.4 Inductions
-
3.3.1 Are Inductions recorded
-
Induction Records
-
3.5 Toolbox Talks
-
3.5.1 Are the Toolbox talks recorded?
-
Tool Box Talk Subject
-
Tool Box Talk Attendance
-
3.5.2Why are talks not carried out?
-
3.6 Are Road Closures/Footpath closures required?
-
Permit photo
-
3.7 Are permits to work required for specific tasks?
-
- Hot Works
- Permit to Dig
- Confined Space
- Permit to Demolish
- Work at Height
-
Are these in place?
-
3.8 Daily Diary/Checklist
-
How recorded?
- Paper copy
- Computer on site
-
Is an up to date Traffic management plan in place and on display?
-
Has the TMP been communicated to the workforce?
-
Add media
-
Task sheets observations
4.0 Fire
-
4.1 Is there a printed Fire Plan on display?
-
4.2 Method of raising alarm?
-
- Rotary Bell
- Battery stand alone alarm
- Wired multiple alarm system
- Air Horn
- None
- Wireless Multiple Alarm
- Two Way Radios
-
4.3 Extinguishers and site Fire points
-
4.4 LPG Storage & Use
-
4.5 Emergency Muster Point
5.0 First Aid
-
5.1 First Aid Cover
-
5.1.1 Name of First Aider:
-
5.1.2 Appointed person:
-
5.2 External 1st Aid Signage Displayed?
-
Photo
-
5.3 1st Aid box sufficient for number of operatives on site?
-
5.4 Eye wash station?
-
5.4.1 Are the bottles sealed & within use by date?
-
5.5 Accident Book on site?
-
5.6 Have any accidents occurred on site
-
Have the details been recorded?
6.0 Services
-
6.1 Disconnection Certificates on site?
-
6.2 Service Drawings on site?
-
How have services been located in the ground?
-
Are Sub-scans available?
-
Have service locations been advised to operatives in some way?
-
How?
-
Are any known services marked on the ground by physical means?
-
Services Observations
-
Additional Photos
7.0 Site Plant
-
7.1 Are Daily/Weekly plant inspections being carried out & recorded?
-
Are copies of these records kept on site?
-
7.2 Is there a Plant Register on site?
-
7.3 Is a safe working area/exclusion zone in place in compliance with section 13 of BS6187:2011? Or, for non demolition sites, is all plant working in an organised manner with suitable spacing between working machines?
-
Safe working zone
-
7.4 Trained Operators
-
Do all operators hold a current CCDO,CPCS card
-
7.5 Correct application of Plant?
-
7.6 Lifting Operations?
-
7.6.1 is there a Lift Plan in place, is it suitable for the task?
-
7.7 Lifting Equipment?
-
7.7.1 is the Certification current?
-
7.8 Plant Annual Inspection certs current?
-
Plant observations
-
Plant photo's
8.0 PPE/RPE
-
8.1 Hats,Boots,Vests
-
8.2 Hearing Protection
-
8.3 Masks/RPE (is RPE being used on site)
-
8.3.1 Are all persons face fitted to the mask
-
8.4 Gloves- Are they the correct code for the task?
-
8.5 Eye Protection correct to the task (EN166 A,B,F Rated)
-
8.6 Harness's,Lanyards and Safety Lines being used on site?
-
8.6.1 Are they the correct type with a current inspection record?
-
PPE/RPE observations
-
Photos
9.0 Electric Hand Tools
-
9.1 Are Tools PAT tested and current tag displayed?
-
9.2 Are tools 110v?
-
9.3 Extension Leads in good working order?
-
9.4 Are Tools in good condition with regular checks carried out?
-
Hand Tools observations
-
Additional Photos
10.0 Work Area
-
10.2 Access/Egress
-
10.3 Storage of Materials & Equipment
-
10.4 Are Leading Edges/Openings/Falls from Height protected?
-
10.5 Is internal lighting being used?
-
10.5.1 Is it suitable & sufficient to the task undertaken?
-
10.6 Are Slip/Trip hazards suitably controlled?
-
10.7 Drop Zone in use?
-
Work area observations
-
Photo's
11.0 Scaffold & Access Equipment
-
11.1 Scaffold on site?
-
11.3 Integrity/Ties/Fixings
-
11.4 Netting/Monoflex
-
11.2 Double Handrail
-
11.5 Ladders/Stairs
-
11.6 Inspections
-
Scafftag or other record of inspection
-
Is Access equipment in use?
-
Type of Equipment
- MEWP
- Scissor Lift
- Podium Steps
- Alloy Tower
- Step Ladder
-
11.7 In good working order?
-
11.8 Are MEWP's being used?
-
11.8.1 Are the correct Harness types being used?
-
11.8.2 Is there a rescue plan in place?
-
11.8.3 Is all certification & paperwork in place?
-
Scaffold/Access observations
-
Photos
12.0 Waste & Recycling
-
12.1 Waste Carriers Licence
-
12.2 Are the demolition arisings or soil being reused or recycled where possible?
-
Where are arisings/soil being taken?
-
12.4 Are Hazardous Materials being disposed of in line with current regulations?
-
12.5 Are site boundaries secured to prevent fly-tipping?
-
12.6 Are all waste notes completed and retained?
-
Waste & Recycling Observations
13.0 Subcontractor Works
-
13.1 Are Subcontractors working on site?
-
Are works adequately coordinated?
-
What roles are they carrying out?
-
Are sub-contractors RAM's on site and have they been reviewed?
14.0 Asbestos
-
14.1 Are the works Licensed?
-
14.1.1 Are suitable decontamination/clean down procedures in place?
-
14.1.2 Are all operatives adequately trained in NNLW asbestos removal techniques?
-
14.1.3 Are operatives wearing correct PPE/RPE for the works
-
14.1.4 Has RPE issued been correctly face fitted?
-
14.1.5 Is the working area suitably demarcated & warning signs displayed?
-
14.1.6 Are operatives working in line with SSOW?
-
14.1.7 is the waste skip secure & lockable?
-
14.1.8 are waste disposal documents being recorded correctly?
-
14.1.9 Specific designated muster point in place?
-
14.1.10 Are coveralls fitted correctly & disposed of inline with regulations
-
14.1.11 Is a suitably developed MS in place for the works?
-
MS number:
-
14.1.1 Is an appropriate Plan Of Work in place?
-
POW number:
-
14.1.2 Are suitable decontamination procedures in place?
-
14.1.3 Are all operatives adequately trained in Licensed Asbestos removal techniques?
-
14.1.4 Has the RPE been correctly fitted?
-
14.1.5 Are coveralls correctly fitted & disposed of inline with current regulations?
-
14.1.6 is the work area & transit route suitably demarcated and asbestos warning signs displayed?
-
14.1.7 are operatives handling ACM's inline with Risk Assessments/Plan Of Work?
-
14.1.8 is the enclosure adequate and smoke tested?
-
14.1.9 is the waste skip secure & lockable?
-
14.1.10 Specific designated muster point in place?
-
HSE Notification Number
-
14.2 If the work is complete has a Clearance Certificate been issued and copy kept on site prior to handover?
-
Asbestos Photos
15.0 Environmental
-
15.1 Is the site at risk of flooding?
-
15.2 is there surface water
-
15.2.1 what does it contain, how much is there and where does it go?
-
15.3 Is there any obvious signs of water leaks from pipework around the site?
-
15.4 Are the impacts of operations on the local wildlife and plant life fully understood and planned accordingly?
-
15.5 Are there any conservation designations denoting a protected area or endangered species within the site?
-
15.6 Are all designated conservation protection, or environmentally sensitive, areas of the site marked/fenced and are all staff aware of their significance?
-
15.7 Are there any invasive species on the site that may be spread as a result of the operations on the site?
-
How is the potential spread being stopped?
-
15.8 Is nuisance dust a factor?
-
15.8.1 What measures are in place to reduce the impacts?
-
Are the measures effective?
-
15.9 Is nuisance noise a factor?
-
15.9.1 What measures are in place to reduce the impacts?
-
15.10 Are nuisance fumes a factor?
-
15.10.1 what measures are in place to reduce the impacts?
-
15.11 Are plant lay-down areas and fuel stores located to reduce spillages and possible pollution of soils or watercourses?
-
15.12 Are all tanks, equipment and drums on appropriate bunds/drip trays/plant nappies?
-
15.13 Are all measures to control spills and leaks such as spill kits available and at hand?
-
15.14 Have measures been taken to protect drains and watercourses?
-
15.15 Has an Environmental Tool Box Talk taken place?
-
Observations
-
Photo's
16.0 Health Monitoring
-
16.1 Are Asbestos Exposure Records kept on site?
-
16.2 Do Asbestos Workers have regular Medicals?
-
16.3 Are Hand Arm Vibration Exposure Records kept on site?
-
16.4 Do Operatives who are undertaking Burning have regular Lead Medicals
-
Health Monitoring Comments
16.0 Positives from site visit.
17.0 Advice
Signatures
-
Auditors Signature
-
Site Manager/Supervisor Signature