Department 161 Management Standard Work

Safety

  • All employees are wearing required PPE?

  • Are lock out procedures being followed (i.e. Marlen locked out during washout)?

  • Did your shift stretch today?

  • Enter time and stretch leader:

  • Talk to at least one employee about safety concern. Document issue and corrective actions:

  • The 1st floor curing cooler RYG Chart is up to date and escalation plan is being followed?

Start Up

  • Is FHFP and SSOP documentation complete for stuff room?

  • Is FHFP and SSOP documentation complete for unload room?

  • Does item being ran match the production schedule? Check formula and stick number.

Standard Work

  • Is the casing item # correct for product running?

  • Do PolyClip settings match standard work?

  • List PolyClip settings; if outside operating parameters document corrective action:

  • Do Marlen settings match standard work?

  • List Marlen settings; if outside operating parameters document corrective action:

  • Vacuum horn on and drawing the casing visibly down to horn during stuffing. ( >75 mbar)

  • List vacuum mbar

  • Sizing ring has date written on it and the date is no more than 3 days old

  • List the date

  • Vacuum generator has a date, status and mechanics initials. The date should be no more than 3 days old

  • List the date, status and mechanics initials

  • Measure length, diameter, and weight for 3 random sticks and document. Are they within spec?

  • Stick 1

  • Stick 2

  • Stick 3

  • Audit Marlen vacuum leak form posted in Serpentine office? Time from latest documented date for quad ring replacement and destruction is 7 days or less?

  • Are vats, tools, and materials in home positions? Attach picture of stuff area, unload area, and hallway.

  • Observations

  • 5S Board is up to date; area champions are completing assigned duties and audits?

  • Line tech MSW is completed with no more than 1 failure per day ( 1 failure per 2 checks)

Delivery and Cost

  • Are OEE board and RYG charts up to date and downtime reasons documented?

  • List current OEE

  • Are vats being scraped and squeegees being used?

  • Observations

  • Does the department daily PPOH meet or exceed the 2013 target of 1270 PPOH?

Quality/Sanitation

  • Are employees following proper GMP's in the stuff area? (Includes Maintenance)

  • Are employees following proper GMP's in the unload area? (Includes Maintenance)

  • Do all hand wash stations and foot foamers work in the area?

  • Is there excess meat on Conveyors or on the Floor on the Raw side?

  • Are proper securing and hose out procedures being followed for wash outs?

  • Check both raw and rte areas for condensation.

Actions taken

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.