Information

  • Project Address
  • Store Number

  • Prepared by:

  • Conducted on:

  • Franchise Partner:

  • Development Manager

  • Franchise Area Director:

  • General Contractor

  • Sign Vendor

  • Who's on site

Certificates

  • Certificate of Occupancy

  • Fire Marshal Approval

  • Health Department Approval

  • Test and Balance

  • Comments

  • Photos of the Approvals

Evolution Remodel Elements

Site Work

  • Parking Lot

  • Landscaping

  • Sidewalks

  • Dumpster Enclosure

  • Parking Lot Lighting

  • Comments

  • Photos of the Site Work

Utilities

  • Electric Service

  • Gas Service

  • Water Service

  • Sewer

  • Phone

  • Internet

  • Cable

  • Comments

  • Photos of the Utilities

Building Exterior

  • Wainscoting

  • EIFS

  • Gutters

  • Roof

  • Roof Capping

  • Windows

  • Vestibule

  • Roof Ladder

  • HVAC Units

  • Comments

  • Photos of the Exterior

Interior

Dining Room

  • Flooring

  • Marlite

  • Drywall

  • Painting

  • Trim

  • Wall Paper

  • Ceiling

  • Lighting

  • HVAC Diffusers

  • TV's

  • Cable Install

  • Window Shades

  • Comments

  • Photos of the dining room

Restrooms

  • Tile

  • Drywall

  • Painting

  • Fixtures install

  • Partition Install

  • Paper towel, toilet paper, and soap dispensers install

  • Comments

  • Photos of the restrooms

Cook Line

  • Stainless Steel

  • Flooring

  • Ceiling

  • Lighting

  • HVAC Diffusers

  • Hood install

  • Gas Line

  • Fire Extinguisher

  • POS Lines

  • Hand Sink Install

  • Paper towel and soap dispensers installed?

  • Comments

  • Photos of the cook line

Office

  • Desk

  • Shelving

  • Safe

  • Phone

  • Internet

  • POS Lines

  • Thermostats

  • Comments

  • Photos of the Office

BOH

  • FRP

  • Flooring

  • Ceiling

  • Lighting

  • HVAC Diffusers

  • 3 comp sink install

  • Sanitizing system install for 3 comp sink?

  • Prep sink install

  • Hand Sink Install

  • Paper towel and soap dispensers install

  • Hot water heater

  • Wall Shelving Install

  • Comments

  • Photos of BOH

Exterior signage

  • Pylon install

  • Reader Board install

  • Building signs Install

  • Awnings Install

  • Door Canopies Install

  • Breakfast, lunch, and diner plate install

  • Signs Turn On with a Photo Cell

  • Comments

  • Photos of the Exterior Signage

Interior decor

  • "Huddle In" and "Huddle Back" graphics installed on entry doors

  • Welcome door graphic install

  • Vestibule Frosted Glass install

  • Valance Install

  • Dining room wall decor install

  • Huddle booth graphics install

  • Restroom door graphics install

  • Restroom door graphics install

  • History wall decor install

  • Comments

  • Photos of interior decor

Seating

  • Huddle Booth Install

  • Huddle Booth Lighting is Working.

  • Seating Install

  • Table Tops Install

  • Bar Top Install

  • Chairs and Bar Stools install

  • Comments

  • Photos of the Seating

Equipment

  • Dishwasher install<br>Temperature 110-130. Models differ check sticker on machine for specification.

  • SSDC installed and calibrated dishwasher

  • Soda fountains installed and calibrated?

  • Minute Maid install

  • Royal Cup install.<br>Coffee temperature 190-195 degrees.<br>Tea temperature 200-205 degrees.

  • CO2 install

  • Wall Shelving Install

  • Walk-in cooler Working?<br>Temperature set between 34-39degees.

  • Walk-in freezer Working?<br>Temperature set between 0-10 degrees.

  • Walk-In shelving Install

  • Up-right freezer working?<br>Temperature set between 0-10 degrees.

  • Up-refrigerator working?<br>Temperature set between 34-39 degrees.

  • Sandwich table working?<br>Temperature should be set 34-39 degrees.

  • Under counter ice cream freezer working?<br>Temperature should be set between 14-17degrees

  • Toasters working?

  • Waffle makers working?

  • Heated Holding Cabinet working?<br>Temperature set at 165 degrees.

  • Steam Wells working?<br>Temperature set 175 degrees t- 5 degrees.<br>

  • Convection oven working?<br>Program set for 20 minutes at 325 degrees.

  • Ice maker working?

  • Fryers calibrated and working?<br>Temperature set at 350 degrees.

  • Eye burners calibrated and working?

  • 4ft Grill calibrated and working?<br>Temps should be set from left to right. 200-350-350-375 degrees

  • 3ft grill calibrated and working?<br>Temperatures should be set on all three controls at 350 degrees.

  • Egg mixers working?

  • Comments

  • Photos of the equipment

Punch list items

  • Punch list

  • Punch list photos

Final Remodel Approvals

  • Development Manager

  • Franchise Partner

  • FAD

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.