Title Page
HAC - Identify - Assess - Control - Monitor - Re-Assess
-
Document No.
-
Supervisor
-
Conducted on
-
Site Assessment led by
-
Section
-
Asset Location i.e. Pole no., sub name, kiosk name, etc.
-
Location
Site Information
Talk about the job! Use the section below to sketch a plan vies of the worksite. Or take a picture. Everybody involved! Does anything on this site change the way we normally do our work?
-
Take a photo of the site
-
Describe the site in writing
-
Describe the job/tasks to be completed: (identify the major steps & who is doing the work).
Safe Work Method Statement (SWMS)
-
Enter SWMS information
SWMS
-
SWMS Number
-
Summary of SWMS name
-
Applicable tasks
Other Information
STOP! After a work break, team membership changes, site conditions change or something causes you to change your work processes. THINK! About current and additional controls and re-assess the job. DO! If the Pre-Work Discussion highlights safety issues, they must be resolved with you Supervisor before commencing work.
Mandatory Discussion Prompts (refer to Blue Folder - Be Safe Pro10.2F and Be Safe Pro10.5F
-
Emergency contact numbers
-
Evacuation Point
-
First Aid Kit Location
-
Other First Aid Kit location
-
Job Packet Information on site?
-
Will we affect other people on site or they affect us?
-
What will we do?
-
Asset/Dial Before You Dig plans on site?
-
Additional Supervision?
- Contractor
- Apprentice
- Visitor
- Other
- N/A
-
The responsible person (RP) that is providing supervision will be?
-
Transmission HV
-
Access Permit no.
-
Distribution HV
-
Access Permit no.
-
Low Voltage
-
Permit No. (If applicable)
Fatal Risks
Job Discussion - Fatal Risk Assessment Table. Refer to the Blue Folder for Hazard Prompts and HAC Instructions.
-
1. Uncontrolled discharge or contact with electricity
-
Describe Fatal Risk
-
Take Photo/s of Fatal Risk.
-
Assess Risk No.
-
Control
-
Residual Risk No.
-
2. Exposure to Hazardous Materials
-
Describe Fatal Risk
-
Take Photo/s of Fatal Risk.
-
Assess Risk No.
-
Control
-
Residual Risk No.
-
3. Fall from Heights
-
Describe Fatal Risk
-
Take Photo/s of Fatal Risk.
-
Assess Risk No.
-
Control
-
Residual Risk No.
-
4. Motor Vehicle Accident
-
Describe Fatal Risk
-
Take Photo/s of Fatal Risk.
-
Assess Risk No.
-
Control
-
Residual Risk No.
-
5. Unintended contact with Mobile Powered Plant
-
Describe Fatal Risk
-
Take Photo/s of Fatal Risk.
-
Assess Risk No.
-
Control
-
Residual Risk No.
-
6. Struck by falling/moving object
-
Describe Fatal Risk
-
Take Photo/s of Fatal Risk.
-
Assess Risk No.
-
Control
-
Residual Risk No.
-
7. Incident whilst undertaking lifting operations
-
Describe Fatal Risk
-
Take Photo/s of Fatal Risk.
-
Assess Risk No.
-
Control
-
Residual Risk No.
-
8. Uncontrolled collapse of excavation work
-
Describe Fatal Risk
-
Take Photo/s of Fatal Risk.
-
Assess Risk No.
-
Control
-
Residual Risk No.
-
9. Breach of controlled worksite when working near or around traffic
-
Describe Fatal Risk
-
Take Photo/s of Fatal Risk.
-
Assess Risk No.
-
Control
-
Residual Risk No.
Job Discussion - Additional Risk Assessment Table. Refer to the Blue Folder for Hazard Prompts and HAC Instructions.
-
Are there any key specific site hazards?
-
Key Site Specific Safety Hazards
Site Specific Hazard
-
Describe Site Specific Risk
-
Take Photo/s of Site Specific Risk.
-
Assess Risk No.
-
Control
-
Residual Risk No.
Monitor Ongoing monitoring of hazards and controls is required for the duration of the work. Has anything changed?
-
Do you need to re-assess any new hazards?
-
Re-Assess any New Hazards below
New Hazards
-
Describe New Hazard Risk
-
Take Photo/s of New Hazard
-
Assess Risk No.
-
Control
-
Residual Risk No.
-
Have the risks been reduced to As Low As Reasonably Practicable (ALARP)?
-
Do not commence work and contact your supervisor. (For multi site ALARP see multi site address box)
Signing onto HAC
WORKSITE STAFF All persons signing on this form declare that they are fit for work and all staff, contractors and others involved with this work activity must discuss the hazards, implement risk controls and sign on to accept this hazard check prior to commencing work. All work conducted will be in accordance with the identified SWMS. If you are an apprentice (A), an inexperienced contractor (C), visitor (V), or other (O) - additional supervision is required and you must initial (A, C, V or O) next to your signature. The responsible person on site must sign the Responsible Persons box next to the person(s) they are "looking after"
-
Worksite Staff
Name
-
Name
-
Are you an Apprentice, Inexperienced Contractor, Visitor, or Other?
-
Responsible Person in charge of supervising this person
Multi Site HAC
-
Is this a multi site HAC?
-
Address Details
Address
-
Asset Location i.e. Pole no., sub name, kiosk name, etc.
-
Take photo of the new location/task
-
Site Location
-
Multi site ALARP
-
If you cannot control the risk to As Low As Reasonably Practicable then do not commence work and contact supervisor