Title Page
-
Site Survey Information
-
Conducted on
-
Job Number
-
Quote Reference
-
Site Name
-
Address
-
Client Company
-
Client Contact Name
-
Client Contact Telephone
-
Client Contact Email
-
Site Contact for the Works
-
Brief Overview of Works
-
Is RJPN responsible for LV Switching
-
Is RJPN responsible for HV Switching
-
Program of Works
-
Black Building or Sectional Switching
-
Operation of an EPO
-
Working Days
-
Working Hours Onsite
-
Spec / Design Document
-
Any Drawings for Works
-
Schematic (Pics or Upload)
-
Grading Study
-
Earthing Survey
-
Any Third Party Contractor Works
-
DNO Required (sub Ref)
-
Notes
-
Photographs Section
Maintenance
- Substation
-
Substation Name
-
Substation Type (Indoor / Outdoor)
-
HV Equipment
-
Transformers
-
LV Equipment
-
Protection Relays
-
Battery Chargers
-
PFC
-
Generator Backup
-
ATS
-
Earthing Arrangements
-
Date Last Maintained
-
Extinguishant System
-
Any NeDDerS
-
3/4 Pole Breakers (NE Links)
-
Castel Keys
-
Bus Couple Supplies
-
Additional
-
Notes
-
Photographs Section
Projects
-
List of Tasks below
Task
-
Task Name
-
Description of Task
-
Design
-
Procure (List Materials)
-
Install
-
Test / Commission (Voltages & Duration)
-
Any Hired Equipment Required
-
Any Subcon Labour Required
-
Notes
-
Photographs Section
Site Access / Egress
-
Access on the Day (Main or Contractors Entrance / Loading Bay)
-
Access to works location (Vertical Ladder / Staircase / Lifts)
-
Parking Onsite (Loading Bay / Carpark / On Street)
-
Access to Parking Location (1 Way Roads / Shared Access)
-
Anything Additional (Car Lift / Barriers)
-
Toilets and Welfare onsite
-
Client to Provide Emergency Lighting
-
Emergency Escape Route