Title Page
-
Site conducted
-
Premises
-
Client
-
Postcode
-
UPRN No.
-
Conducted on
-
Surveyor
-
Surveyor
-
Type of premises
- Purpose-built flats
- Large building repurposed into flats post 1992
- House converted into flats
- Sheltered accommodation
- Supported living premises
- Residents community lounge or facility
- Offices
- House in multiple occupation
- Communal Laundry
- Communal Boiler House
- Other
-
Describe
-
Is this a general needs premises?
-
Describe
Fire safety equipment - periodic inspections, maintenance and testing
-
Is there any fire safety equipment that requires inspection and maintenance (e.g. 6-monthly/12-monthly etc)?
Fire safety equipment present in this premises
-
Type of equipment?
-
Describe
-
There is no fire safety systems or equipment within the premises currently that requires maintenance and inspection.
-
Is there currently inspection and maintenance (e.g. 6-monthly/12-monthly etc) of this equipment?
-
Up to date evidence was provided.
-
No evidence was provided during the site survey.
-
Reason
- No testing required
- Relatively new
- No inspection or maintenance required
-
This equipment is not considered to require any formal maintenance and inspection.
-
This equipment is relatively new and was not due for any inspection and maintenance at the time of the premises survey.
-
No evidence was provided.
-
Is there testing (e.g. weekly/monthly etc) of this equipment?
-
Up to date evidence was provided.
-
No evidence was provided during the site survey.
-
Reason
- No testing required
- Relatively new
- No inspection or maintenance required
-
This item is not considered to require any weekly/monthly testing.
-
This equipment is relatively new and was not due for any testing at the time of the premises survey.
-
No evidence was provided.
Means of escape design
-
Are there any areas not under the control of the client
-
Number of internal stairways
-
Does this arrangement offer alternative stairways for escape?
-
Number of external stairways (not including small flights of steps)
-
Does this arrangement offer alternative stairways for escape?
-
Ground floor construction
-
Describe
-
Between floor level construction
-
Describe
-
The evacuation policy
-
Describe
-
Flat entrance door locations
-
Describe
Stairway smoke control arrangements
- Stairway
-
Equipment fitted
-
Describe
-
Photo of arrangements
-
Are manual overrides provided?
Manual override locations
-
Photos of manual overrides (6-10 metres if possible and showing location in relation to stairway)
-
Manual override locations
-
Room/area
-
Photo
Corridor smoke control arrangements
-
Are there smoke control arrangements within the corridors?
-
Equipment fitted
-
Describe
-
Photos of arrangements including mechanisms
-
Are manual overrides provided?
-
Photos of manual overrides (showing location relationship to corridor)
-
Was it possible to take photos of mechanisms etc (vents open)?
-
Vent operating mechanisms
-
Photo
Lobby smoke control arrangements
-
Are there smoke control arrangements within the lobbies?
-
Equipment fitted
-
Describe
-
Photos of arrangements including mechanisms
-
Are manual overrides provided?
-
Photos of manual overrides (showing location relationship to corridor)
Manual override locations
-
Manual override locations
-
Room/area
-
Was it possible to take photos of mechanisms etc (vents open)?
-
Vent operating mechanisms
-
Photo
Common area fire door information
Door identification based upon available information
-
Floor level
-
Room/area
-
Door identification
-
Describe
-
Door status
-
Evidence labels/plugs/etc
-
Door leaf
- Timber
- Suspected to be GRP
- Known to be GRP
- uPVC
- Undetermined
- Other
-
Door leaf photo
-
Door frame
- Timber
- Suspected to be GRP
- Known to be GRP
- uPVC
- Undetermined
- Other
-
Door frame photo
-
Self-closer fitted?
-
Self-closer photo
-
Intumescent seals/smoke seals status
-
Intumescent seals/smoke seals photos
-
Door free from defects?
-
Defects present
Dry/wet riser locations
-
Dry/wet riser locations
-
Photo
Inside sampled flat
-
Was it possible to sample the internal areas of a flats?
-
Flat number
Door identification based upon available information
-
Door identification
-
Describe
-
Door status
-
Evidence labels/plugs/etc
-
Door leaf
- Timber
- Suspected to be GRP
- Known to be GRP
- uPVC
- Undetermined
- Other
-
Door leaf photo
-
Door frame
- Timber
- Suspected to be GRP
- Known to be GRP
- uPVC
- Undetermined
- Other
-
Door frame photo
-
Self-closer photo
-
Intumescent seals/smoke seals status
-
Intumescent seals/smoke seals photos
-
Door free from defects?
-
Defects present
Fire detection within flat
-
Room within flat
-
Type of detector
-
Are there any extraction fans fitted that do not appear to discharge directly through walls/windows etc and may have ductwork?
Rooms within flat
-
Extraction photo
-
Rooms within flat
-
Photos of windows/balcony doors
-
Is there a balcony present?
-
Balcony photos
-
Balcony materials
Other balconies/shared terrace/solar shading surveys
-
Was it possible to survey any of these features outside of the flat sampled?
Other balconies/shared terrace/solar shading surveys
-
Room/flat/area?
-
Feature sampled
-
Balcony type
-
Balcony type photos
-
Balcony materials
-
Balcony materials photos
-
Other balcony type photos
-
Describe
-
Within structure balcony photos
-
Balcony ceiling photos
-
Balcony ceiling materials
-
Shared terrace materials
-
Shared terrace materials photos
-
Solar shading system materials
-
Solar shading system materials photos
-
Describe
-
Materials
-
Materials photos
Sprinkler coverage
-
Does the building have a fire sprinkler or water mist system?
-
Coverage
-
Describe
Fire compartmentation
-
Other than items that may already been identified in the last FRA, in the areas surveyed, is the fire compartmentation of a reasonable standard
Location
-
Photo
-
Floor level or area
-
Room/area
Fire risk assessment considerations
-
Is it considered that the last FRA accurately captures all significant issues and there is a suitable action plan to remediate them?
-
Describe
Note pad
- Surveyors notes
-
Add media
-
undefined
Complete survey
-
Press 'Mark Complete' to end survey whilst on-site - if you have not completed any mandatory items, iAuditor will take you to them. You can only complete the survey when all mandatory items are answered.