Information

  • Audit No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

PPE

  • Correct PPE worn by all employees

Traffic

  • Adequate traffic management for days paving activities

Equipment availability

  • Adequate equipment available on site (rollers / multi / MTV etc)

Temperature

  • Temperature of asphalt supplied within specified range for product.<br>I.e. C class binder 135-175oC<br> PMB binder 135-185oC

Construction Procedures

  • Progressive compaction results communicated

Near Miss Reporting

  • Near Miss Reporting understood

  • Any near miss reported to 1800 366766

Quality Plan

  • QP available

  • QP utilised

Project Management Plan

  • PMP available

  • PMP utilised

Rolling Pattern

  • Rolling pattern set up

  • Rolling pattern followed

Paving Plan

  • Paving plan available

  • Paving plan followed

SWMS

  • Are SWMS available on site

  • Are SWMS signed off by all personnel

Tool box talks

  • Conducted on site

  • Adequate information noted / risks or hazards noted

Construction ITP's

  • ITP's followed

  • Available on site

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.