Information
-
Project WO No/ Reinstatement Address
-
Conducted on
-
Priority
-
Prepared by
-
Client
- Yarra Valley Water
- Downer Gas
- APA
- City West Water
- Mondo
- Power
- Abergaldie
-
City Council Area
- Banyule City Council Area
- Boroondara City Council Area
- Brimbank City Council Area
- Cardinia City Council Area
- Darebin City Council Area
- Hobsons Bay City Council Area
- Hume City Council Area
- Manningham City Council Area
- Maribyrnong City Council Area
- Melbourne City Council Area
- Melton City Council Area
- Mitchell Shire Area
- Monash City Council Area
- Moonee Valley City Council Area
- Moreland City Council Area
- Moroondah City Council Area
- Nillumbik Shire
- Stonnington City Council Area
- Sunbury City Council Area
- Whitehorse City Council Area
- Whittlesea City Council Area
- Wyndham City Council Area
- Yarra City Council Area
- Yarra Ranges Shire
Reinstatement 1
-
Type
- Asphalt <= 100mm
- Asphalt > 100mm
- Concrete (Kerb & Channel)
- Concrete <= 100mm
- Concrete > 100mm
- Bluestone Paving
- Bluestone (Kerb & Channel)
- Asphalt Re-sheet
- Top Soil
-
Dimensions (L x W) in meter
-
Preconstruction Photos
Reinstatement 2
-
Type
- Asphalt <= 100mm
- Asphalt > 100mm
- Concrete (Kerb & Channel)
- Concrete <= 100mm
- Concrete > 100mm
- Bluestone Paving
- Bluestone (Kerb & Channel)
- Asphalt Re-sheet
- Top Soil
-
Dimensions (L x W) in meter
Reinstatement 3
-
Type
- Asphalt <= 100mm
- Asphalt > 100mm
- Concrete (Kerb & Channel)
- Concrete <= 100mm
- Concrete > 100mm
- Bluestone Paving
- Bluestone (Kerb & Channel)
- Asphalt Re-sheet
- Top Soil
-
Dimensions (L x W) in meter
Reinstatement 4
-
Type
- Asphalt <= 100mm
- Asphalt > 100mm
- Concrete (Kerb & Channel)
- Concrete <= 100mm
- Concrete > 100mm
- Bluestone Paving
- Bluestone (Kerb & Channel)
- Asphalt Re-sheet
- Top Soil
-
Dimensions (L x W) in meter
-
Underground or Surface Assets Located
- Yes
- No
- Communication to the resident has been conducted to assist with any private assets that may impact the scope of works within the private boundary line
-
Services Comments
-
Special Comments
- CONCRETE MIXTURE "must have" 2% black colour through the concrete mixture as per council's specifications and standards
- CONCRETE MIXTURE "must have" 2% charcoal colour through the concrete mixture as per council's specifications and standards
- This Property is located within "designated FIRE ZONE area" so if the weather conditions aren't favorable due to high temperatures and strong winds or is an official Total Fire Ban Day, then works will need to be rescheduled to a day that has more mild and suitable working conditions - if a Total Fire Ban Day then works need to be cancelled and rescheduled
- PROGRAMMING OF WORKS (Recommended Options) - (1) On any weekday restricted to 9:30 am - 3:30 pm avoiding both morning and afternoon peak traffic period flows on this major VicRoad network. (2)Early on a Saturday morning or Sunday morning from 7:00 am on wards or any other alternatives if suitable to the associated contractors current scheduling.
- PROGRAMMING OF WORKS - Night Shift
-
General Project Comments
-
Location
-
TC Requirement
-
Traffic Conditions
- Stop/Slow Signs
- Contraflow
- Shoulder/ Lane Closure
- Road Closures/ Detour
- Clear Way
- Kick over/ Major Setup
-
Line Marking
- Straight Line
- Piano Shape Speed Hump
- Give Way Bars
- Stop Line
- Centre Line
- Parking Line
- Bus Lane Red
- Cycling Lane Green
- Cycling line
- Cyclist shape
- Others