Information
-
Audit Title
-
Project Site
-
Project Number
-
Stage
-
Location
-
Client
-
Conducted on
-
Prepared by
Site Condition
-
Weather
-
Site Condition
1.0 - OH&S & Environment
-
1.1 - Any incidents, near misses or hazards?
-
Provide details of incident, near miss or hazard;
-
1.2 - EMP Observations -
-
1.2.1 - Noise & Vibration<br>
-
Description -
-
1.2.2 - Air Quality/Dust Control
-
Description -
-
1.2.3 - Stockpiling of Materials
-
Description -
-
1.2.4 - Erosion and Sediment Control
-
Description -
-
1.2.5 - Stormwater Management
-
Description -
-
1.2.6 - Vegetation Protection
-
Description -
-
1.2.7 - Solid Waste Management
-
Description -
-
1.2.8 - Traffic Management
-
Description -
2.0 - Contractor Progress
-
2.1 - Road and Drainage
-
Current Progress -
-
- Stripping Works
-
- Bulk Earthworks
-
- Drainage Trenching Works
-
- Drainage Pipe Laying and Jointing Works
-
- Road Boxing
-
- Subgrade Improvement Works
-
- Pavement Sub-Base Course
-
- AGI Drains Installation
-
- Road Crossing Conduits Installation
-
- Pavement Sub-Base Course Works
-
- Kerb and Channel Works
-
- Pavement Base Course Works
-
- Concrete Footpath and Vehicle Crossings Works
-
- Asphalt Prime
-
- Asphalt Base Course
-
- Asphalt Wearing Course
-
- Line Marking
-
- Traffic and Street Signs Installation
-
- Topsoiling Works
-
2.2 - Sewer Reticulation
-
Current Progress -
-
- Sewer Trenching Works
-
- Sewer Pipe Laying and Jointing Works
-
- Backfilling of Pipe
-
- Maintenance Shaft and Manhole Construction
-
- Property Connection Installation
-
- Finished Covers
-
- Pre-testing (Ovality, Vacuum/Pressure)
-
- Asset Recording
-
- Test Audits (with Authority)
-
- Date of Authority Audit to Testing
-
- Target/Anticipated Authority Audit to Testing Date
-
- Final Connection
-
- Connection date
-
- Target/Anticipated Connection date
-
2.3 - Water Reticulation
-
Current Progress -
-
- Water Reticulation Trenching Works
-
- Water Reticulation Pipe and Jointing Works
-
- Backfilling of Pipes
-
- Property Connection Installation
-
- Finished Covers
-
- Pre-testing (Pressure)
-
- Asset Recording
-
- Swab Test (with Authority)
-
- Date of Swab Test (with Authority)
-
- Pressure Test (with Authority)
-
- Date of Pressure Test (with Authority)
-
- Target/Anticipated Date of Pressure Test (with Authority)
-
- Hydrant Post and Pavement Markers
-
- Flushing
-
- Flushing Date
-
- Target/Anticipated Flushing Date
-
- Water Quality Test
-
- Water Quality Sampling Date
-
- Target/Anticipated Water Quality Sampling Date
-
- Chlorination (mains >225mm dia)
-
- Chlorination Date
-
- Target/Anticipated Chlorination Date
-
- Final Connection
-
- Connection Date
-
- Target/Anticipated Connection Date
-
2.4 - Electrical and Telecommunications Reticulations
-
Current Progress -
-
- Electrical and Telecommunications Trenching Works
-
- Trench Embedment Works
-
- Electrical Conduit and Cable Installation Works
-
- Telecommunication Conduit and Cable Installation Works
-
- Warning Tape and Backfilling
-
- Electrical Trench Audit
-
- Trench Audit Date
-
- Target/Anticipated Trench Audit Date
-
- Electrical Pit Installation
-
- Telecommunication Pit Installation
-
- Electrical Property Connection Conduits Installation
-
- Telecommunication Property Connection Conduits Installation
-
- Kerb Markings (Road Crossings)
-
- Light Pole Installation
-
- Electrical Compliance Audit
-
- Compliance Audit Date
-
- Target/Anticipated Compliance Audit Date
-
- Electrical Pre-commissioning Audit
-
- Pre-commissioning Audit Date
-
- Target/Anticipated Pre-commissioning Audit Date
-
- Electrical Connection
-
- Connection Date
-
- Target/Anticipated Connection Date
-
- Telecommunication Compliance Audit
-
Telecommunication Audit Date
-
- Target/Anticipated Telecommunication Audit Date
-
2.5 - Main Drain/Outfall (Melbourne Water)
-
Current Progress -
-
- Bulk Earthworks
-
- Drainage Trenching Works
-
- Main Drain Pipe Laying and Jointing Works
-
- Pit Construction
-
- Outfall Treatment Works
-
- Clay Liner Works
-
- Rock Beaching Works
-
- Connection to Existing Infrastructure/Water Body
-
- Asset Recording
-
- PC Inspection with Melbourne Water
-
- PC Inspection Date
-
- Target/Anticipated PC Inspection Date
-
2.6 - Major Roads
-
Current Progress -
-
Type of Works
-
- Existing Services Proving Works
-
- Bulk Earthworks
-
- Drainage Works
-
- Saw-cut Existing Pavement
-
- Road Boxing
-
- Subgrade Improvement Works
-
- Pavement Capping Layer
-
- Pavement Sub-Base Course
-
- AGI Drains and Road Crossing Conduits Installation
-
- Kerb and Channel Works
-
- Pavement Base Course
-
- Concrete Infill and Footpath Works
-
- Asphalt Prime
-
- Asphalt Base Course
-
- Asphalt Wearing Course
-
- Line Marking Works
-
- Traffic Sign Installation
-
- Make Good Existing (e.g. crack seal, removal existing line marking, topsoiling etc.)
-
- Existing Services Proving Works
-
- Bulk Earthworks
-
- Drainage Works
-
- Saw-cut Existing Pavement
-
- Road Boxing
-
- Subgrade Improvement Works
-
- Pavement Capping Layer
-
- AGI Drains and Conduits Installation
-
- Kerb and Channel Works
-
- Pavement Base Course
-
- Electrical and Telecommunications Supply Pit Installation
-
- Traffic Signal Poles Installation
-
- Street Lighting Installation
-
- Traffic Signal Controller Box Installation
-
- Asphalt Prime
-
- Asphalt Base Course
-
- Asphalt Wearing Course
-
- Detector Loop Saw-cut and Install
-
- Lighting and Traffic Signalisation Electrical Works
-
- Lighting and Traffic Signalisation Electrical Connection and Commissioning
-
- Commissioning and Connection Date
-
- Target/Anticipated Commissioning and Connection Date
-
- Existing Services Proving Works
-
- Existing Services Relocation Works
-
- Bulk Earthworks
-
- Drainage Works
-
- Saw-cut Existing Pavement
-
- Road Boxing
-
- Subgrade Improvement Works
-
- Pavement Capping Layer
-
- Pavement Sub-base Course
-
- AGI Drains and Road Crossing Conduits Installation
-
- Kerb and Channel Works
-
- Pavement Base Course
-
- Concrete Infill and Footpath Works
-
- Asphalt Prime
-
- Asphalt Base Course
-
- Asphalt Wearing Course
-
- Line Marking Works
-
- Traffic Signs Installation
-
- Make Good Existing (e.g. crack seal, removal existing line marking, topsoiling etc.)
3.0 - Current Works Status Against Construction Programme
-
3.1 - Current Works Status versus Construction Programme
-
3.2 - Construction programme comments
4.0 - Miscellaneous
-
Miscellaneous Comments -