General Work Environment:

  • 1. Are all work areas clean and orderly?

  • 2. Are aisles, walkways, doorways, and exit routes kept clear and un-obstructed?

  • 3. Are all work surfaces kept dry and means taken to assure the surfaces are slip resistant?

  • 4. Are all work areas adequately lighted?

  • 5. Is material piled, stacked or racked in a manner to prevent it from tipping, falling, collapsing, rolling or spreading?

  • 6. Are required postings readily available to all employees in the work place?

  • 7. Are MSDS on-site and in an area that is readily accessible to all employees?

  • 8. Are Safety Orientations being conducted for all employees before being allowed to work on the project?

  • 9. Are weekly and monthly "tool box" safety meetings held and documented with sign up sheets?

  • 10. Are measures in place to protect the public, staff and students exposure to work activities and equipment?

  • 11. Are toilet and washing facilities provided and kept clean?

  • 12. Is GC and DPS Emergency contact information posted at project entrance?

  • Add media

Personal Protective Equipment (PPE):

  • 1. Are hard hats being used by ALL personnel on site?

  • 2. Are safety glasses being used by ALL personnel on site?

  • 3. Are reflective safety vests (or high visibility clothing) being used by ALL personnel on site?

  • 4. Is appropriate foot protection being worn by ALL personnel on site?

  • 5. Is appropriate PPE being used by employees when work task requires?

  • 6. Are respirators (or dust masks) being worn when cutting concrete or block, tile?

  • 6A. Is "wet cutting" of tile or concrete being performed on project?

  • 7. Are dusk masks available for employees that may need them?

  • 8. Is appropriate hearing protection being used when required?

  • 9. Are traffic vests and traffic cones provided and used on site?

  • 10. Are flaggers wearing appropriate orange hardhats and class II safety vests?

  • Add media

First Aid and Emergency Equipment:

  • 1. Are emergency contact numbers posted on the job site

  • 2. Is there at least one person on-site trained in first aid / CPR?

  • 3. Are first aid kits easily accessible, inspected and stocked monthly?

  • 4. Is there a First Aid Trauma bag kept on site?

  • 5. Is there an "Emergency Action Plan" for the project site?

  • 6. Are there at least two emergency exits provided to evacuate in case of an emergency?

  • 7. Are "Emergency Exits" posted and/or signage indicated?

  • Add media

Fire Protection and Prevention:

  • 1. Is there at least one ABC fire extinguisher for every 3000 sq ft of work area?

  • 2. Are fire extinguishers available near stairways?

  • 3. Are fire extinguishers clearly visible and unobstructed at all times?

  • 4. Are fire extinguishers inspected monthly and proper tags applied?

  • 5. Are fire proof cabinets on site and being utilized?

  • 6. Are all fuel gas cylinders and oxygen cylinders secured, separated by 20 feet or have fire resistant barriers in place?

  • Add media

Environmental

  • 1. Silt Fence installed around perimeter ?

  • 2. Storm water plan in place?

  • 2A. Storm water runoff observed?

  • 3. Storm water permit on site?

  • 4. Asbestos plan in place?

  • 4A. Asbestos abatement conducted on project?

  • 4B. Containment in place for worker protection?

  • 4C. DPS Environmental Specialist approved abatement plan?

Fall Protection:

  • 1. Are holes and other floor openings guarded by a grate, cover, guardrail, or equivalent on all sides? (except at entrances to stairways or ladders)

  • 2. Are there stair rails or handrails on all stairways or ladders?

  • 3. Are railings provided on all ramps?

  • 4. Do all elevated surfaces have guardrails at least 42 inches high?

  • 5. Are all elevated surfaces equipped with a safe means of access?

  • 6. Are fall protection harnesses and lanyards used by all employees working 6 feet above the next lowest surface, or on pitched roofs 6/12 or greater?

  • 7. Are harnesses, lanyards, or other fall protection equipment inspected prior to each use?

  • 8. On roof work is fall protection used?

  • 9. On roof work, are guardrails used on roof edges?

  • 10. On roof work are warning lines used - 6 feet from roof edge?

  • 11. On roof work is there a "dedicated monitor" and warning line system in place?

  • 12. On roof work are fall restraint harnesses used whe working near roof edge?

  • 13. Where a job site has protruding steel rebar exposed, are covers used to prevent impaled injuries?

  • Add media

Portable Ladders:

  • 1. Are all ladders maintained in good condition, inspected before each use, and broken or defective ladders removed from use?

  • 2. Are ladders being used for their intended use only?

  • 3. Are ladder rungs/steps slip resistant and free of dirt, grease, oil, ice, snow, etc.?

  • 4. When ladders are used to gain access to elevated platforms or upper surfaces, does the ladder always extend a minimum of 3 feet above the elevated surface and properly secured in place?

  • 5. Are ladders placed on dry, stable and level footing and properly deployed?

  • 6. Are employees facing the ladder when climbing up or down, using three points of contact?

  • 7. Are employees standing below the top two steps when using step ladders?

  • Add media

Materials Handling, Storage, Use and Disposal:

  • 1. Are compressed gas cylinders secured and stored properly, and blocked from potential traffic or vehicle hazards?<br> (Jersey Barrier use / fenced / Caution signage)

  • 2. Compressed gas cylinders properly capped and secured?

  • 3. Are approved "Flammable Storage Cabinets" on site and being used properly?

  • 4. Are approved "Flammable Liquid containers being utilized? (proper sizes?)

  • Add media

Trenching and Shoring:

  • 1. Are trenches or excavations open on project site?

  • 2. Are spoils, materials and equipment set back a minimum of 2 feet from edge of excavation?

  • 3. Is sloping/benching correct angle and proper material compaction tests completed?

  • 4. Are barriers in place around entire open excavations?

  • 5. Is a means of egress available in all trenches 4 feet or more in depth?

  • 6. Are means of egress within 25 lateral feet of all workers?

  • 7. Is high visibility PPE worn by all employees working in and around trenches?

  • 8. Are employees protected from loose or falling rock or soil?

  • 9. If needed, are trench boxes or shoring used?

  • 10. Are all open holes protected from fall hazards?

  • Add media

Confined Spaces:

  • 1. Are there confined spaces on the project?

  • 2. Is there a "Confined Space" Plan program?

  • 3. Has air quality testing been completed?

  • 4. Is there an outside Attendant present?

  • 5. Is there a retrieval process implemented?

  • 6. Is 911 the process for retrieval?

  • 7. Is the confined space process compliant?

Electrical:

  • 1. Are all cord-connected, electrically-operated tools and equipment double insulated or effectively grounded?

  • 2. Are all electrical cords inspected and in good working condition? (NO frays or splices - plug insulation intact)

  • 3. Do all extension cords have 3 prong plugs and all 3 prongs intact?

  • 4. Are ground-fault circuit interrupters provided on all temporary electrical circuits used and tested regularly?

  • 5. Are all extension cords a No 12 or larger and properly marked? (1926-405(g)(2) )

  • 6. Where electrical cords must cross roads, driveways, or walkways, are they protected by solid weather resistant bridges to prevent damage to the cords?

  • 7. Where extension cords are used inside, is proper "cord maintenance" method in place to prevent tripping hazards?

  • 8. Where temporary lighting is used, are all cords suspended from walls or ceilings properly?

  • 9. Are light bulbs protected from being struck and breakage?

  • 10. Are electrical circuits and equipment shut off, de-energized and proper "Lockout/Tagout" being used before service or repairs?

  • 11. Are unused switches, receptacles and junction boxes covered with covers or plates?

  • 12. Are multiple plug adapters and power strips (octopus plugs) prohibited on the project site?

  • Add media

Scaffolding:

  • 1. Are scaffolds on level stable ground?

  • 1.A Approved mud sills used?

  • 2. Has the scaffold been assembled and inspected by a competent person?

  • 3. Is daily inspection tag completed and displayed?

  • 3.A Is a "Red Tag" in place when scaffold is not in use?

  • 4. Do all scaffolds higher than 6 feet have 42 inch high guardrails and midrails in place?

  • 5. Are guardrails in place at the open ends of scaffolds?

  • 5.A Is "X" bracing installed on the ends of scaffolds and every third set horizontally / every fourth set vertically?

  • 6. Have toe boards been installed to prevent falling objects?

  • 7. Are all ladders or stairs used to access scaffolds either tied or secured to the scaffolds for safe access?

  • 7.A Are ladders positioned to provide direct access to scaffold?

  • 8. Are open sides of scaffold less than 14 inches from the face of work?

  • 9. Are scaffolds in good working condition with no damage or missing parts?

  • 9.A Are all pins installed and locked in place?

  • 9.B Are adjustment screws extended no greater than 18 inches?

  • 10. Do all planks fit tightly with no open space between boards? (no more than 1" open space?)

  • 11. Do all planks extend 6-18" beyond the ends of the scaffold frame?

  • 12. Where planks are overlapped, are the overlapped over the supports?

  • 13. If mobile scaffolds are in use, has the movement of occupied scaffolds been prohibited?

  • 13.A Are castors locked during mobile scaffold use?

  • Add media

Hand Power Tools / Powder Actuated Tools:

  • 1. Are employees who operate powder actuated tools properly trained and carry valid operator"s card?

  • 2. Are all power tools maintained in proper condition?

  • 3. Are damaged and defective tools removed from service as soon as the damage is discovered?

  • 4. Are all tools with exposed moving parts equipped with appropriate safety guards to prevent contact with moving parts?

  • 5. Are all tools maintained in safe condition?

  • Add media

  • Select date

Safety Audit Acceptance:

  • Site representative:

  • DPS SafetyAuditor: Sam Adair, DPS Safety Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.