Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General Customer Information
-
What is the customer name, billing address, phone number, fax number, email address, or other contact information?
-
How did you hear about us?
- Angie's List
- BBB
- Business Solicited
- Coutura
- Dennis
- Dex (yellow)
- Existing
- Falcon Directory
- Friend
- Internet
- Prospectors
- Signs
- Stickers (panel)
- Tri-Lakes Directory
-
Are the devices grounded? What color and style are they?
-
Are there CO detectors where required? If not, inform the customer of the requirement.
Job Proposal Information
-
Scope of Work
-
Are there any specific inclusions?
-
Are there any specific exclusions?
-
Have you offered the customer a verbal estimate? If yes, describe the offer.
-
When is the proposal promised?
Panel Information
-
Panel Photos
-
What is the voltage of the panel?
- 120/240 1ph
- 120/208 3ph
- 240 1ph
- 240 3ph (delta)
- 277/480 3ph
- 480 3 ph (delta)
- Other
-
What is the amperage of the main?
- 50
- 70
- 90
- 100
- 125
- 150
- 175
- 200
- 225
- 400
- 600
- 800
- OTHER
-
Is this panel the service?
-
What is the make of the panel?
- Bryant
- Cutler Hammer
- FPE
- GE
- Square D Homeline
- Square D QO
- Sylvania
-
What is the disconnecting means?
- None
- MCB
- Fused
- Non-Fused
- Other
-
Do we need to replace the panel?
-
Panel Interior
-
What type of wiring is there?
-
Where are the conductors entering from?
- Top
- Top/Bottom
- Top/Bottom/Side
- Sides
- Bottom
-
What size is the feeding nipple?
- .75"
- 1"
- 1.25"
- 1.5"
- 2"
- 2.5"
- 3"
- 3.5"
- 4"
-
Is there a ground bushing on the feeding nipple?
-
Do we need to change the feeding nipple?
-
Are there 3 wire circuits? If yes, include the appropriate quantity of 2 pole breakers below.
-
Do we need a grounding bus bar?
-
Breaker Information
-
Are we replacing breakers?
-
How many 1 pole 15a breakers are needed?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
How many 1 pole 15a GFCI breakers are needed?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
How many 2 pole 15a breakers are needed?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
How many 1 pole 20a breakers are needed?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
How many 1 pole 20a GFCI breakers are needed?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
How many 2 pole 20a breakers are needed?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
How many 2 pole 30a breakers are needed?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
How many 2 pole 50a breakers are needed?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Are the any other or AFCI breaker requirements?
Service Entrance / Meter / Outside Grounding Information
-
Service Entrance / Meter / Outside Grounding Photos
-
Are the service entrance conductors overhead or underground?
-
What size is the service entrance conduit?
- .75"
- 1"
- 1.25"
- 1.5"
- 2"
- 2.5"
- 3"
- 3.5"
- 4"
-
What size are the service entrance conductors?
- 6
- 4
- 3
- 2
- 1
- 0
- 00
- 000
- 0000
- 250
- 300
- 350
- 400
- 500
- Other
-
What type of material is the service entrance conductors?
-
Does the service entrance conduit need to be replaced?
-
Do the service entrance conductors need to be replaced?
-
Does the meter need to be replaced?
-
Do we need any ground rods?
-
If yes, how many?
-
Do we need to install an "interconnect bridge" device?
Inside Grounding Information
-
Inside Grounding Related Photos
-
Do we need to install a cold water ground?
-
Is the water meter bonded?
-
If no, how many clamps do we need?
-
Other information
Safety Information
-
Safety Related Photos
-
Are there any general safety hazards that our technicians need to be aware of?
-
Will the utility company need to disconnect the service?
-
Will any procedure involve an OSHA Risk/Hazard rating higher than 0?
-
If yes, what is that Risk/Hazard rating?
-
Do we need to use a Lockout/Tagout procedure? If yes, provide details.
Other Information
-
Material List
Sketches / Photos
-
Sketch #1
-
Sketch #1
-
Sketch #1 Related Photos
-
Sketch #2
-
Sketch #2
-
Sketch #2 Related Photos