Title Page
-
Working Area
-
Blast ID
-
Date
-
D&B Engineer
-
Drill Supervisor
Drill & Blast Engineer
-
Boundary pegs have been installed by survey department
-
Area has been inspected by D&B Engineer
-
Area ready to be handed over to Drill Supervisor for clean-up
-
Signature
Drill Supervisor
-
Heavy vehicle segregation been established where required
-
Edges have been pushed past boundary and windrows have been established
-
Working area has been leveled, graded and adequate drainage established
-
Working area has been delineated with cones and signs
-
If required, access established for trailing cable path
-
Working area has been cleaned up to the full perimeter
-
If No, why can't the area been cleaned up to the full perimeter?
-
Is the area ready to be surveyed
-
Signature