Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Weather conditions
- Sunny
- Heavy
- Light
- Rain
- Showers
- Drizzle
- Snow
- Hail
- Foggy
- Overcast
- Cloudy
- Strong
- Light
- Windy
- Breeze
- Hot
- Warm
- Humid
- Cool
- Cold
- Dry
- Wet
- Damp
Personnel on Site / Meetings
-
Name
-
Name
-
Name
-
Name
-
Name
-
Name
Meetings
-
undefined
Identified Risk
-
Surface Casing
-
Intermediate Stage
-
Final Stage
-
Resources (Rigs, telehandler, shaker etc..)
-
Water
-
Consumables
-
QA/QC (Deviation, core handling etc..)
General Activities
Activities carried out on site
-
General
Borehole Data
-
Borehole Number?
-
Setup signed off by Aecom
-
Permit Issued
-
Is Permit valid?
Deviation Checks using E-Totco tool
-
Are E-Totco deviation readings required?
-
Initial E-Totco tool deviation check (free suspended on rope); Recorded deviation
-
Can coring commence?
-
What drilling stage are the deviation checks being carried out?
Deviation Readings
-
Totco tool deviation check taken: Depth & recorded deviation
General Sampling Requirements
-
Core to be boxed, taped and labelled
-
Is core required to be retained?
-
Is core required to be cut as per BGS Specification?
-
Water Samples to be taken using the "jug on a stick" from the borehole collar
-
Water samples to be collected every
- 1.5m drilled (at end of every core run)
- 5.0m drilled
- 6.0m drilled
- Not Required
-
Are Geophysics / wire line logging required?
Intermediate Section
-
Core Runs boxed....
-
Water samples taken....
Lower / Final Borehole Section
-
Core runs boxed....
-
Water samples taken....
Crosswire Deviation Checks
-
Borehole Stage
- Intermediate Section (Temporary Casing)
- Intermediate Section (Permanent Casing)
- Intermediate Section (Open Hole)
- Lower Section (Open Hole):- Pilot Hole
- Lower Section (Open Hole):-During Opening Out / Reaming Operations
- N/A
-
Depth; Northern / Southern reading; Western / Eastern reading.
Signed
-
Signed