Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
1. Has the borehole location been established?
-
2. Have underground utilities been cleared by third party utility locate?
-
3. Has the Immediate Danger Zone 6-foot set back from moving and rotating equipment been measured out and marked?
-
4. Is the ground within the 6-foot set back area free from tools, trash, heavy vegetation?
-
5. Has the Driller ensured that no person is within the Immediate Danger zone/ exposed to entanglement hazards?
-
6. Are all non-drilling team personnel outside of the 10-foot Exclusion Zone?
-
7. Where rig control panels, emergency stops (kill switches), or other interfaces to control the drilling rig are within this setback barrier, can the Driller ensure that he/ she can maintain full control of the equipment while operating with 100% safety?
-
You are not cleared to drill. Take corrective action.
Take photo of ESTABLISHED IMMEDIATE DANGER ZONE for each borehole
-
Take a photo of the Immediate Danger Zone.
-
It is now safe to commence drilling.