Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Installation Quality
-
Duct at correct depths at
-
Photo evidence of ducts
-
Action to be taken?
-
Is the job being built according to the plans?
-
Has the duct been rolled off using the correct proceedure?
-
Add media
Working at heights
-
Fall risks of 2m or more (including voids, pits and trenches)
-
Add media
-
Lack of edge protection?
-
Add media
-
Unsafe of incomplete edge protection?
-
Add media
Emergency Response
-
Lack of or no emergency plans for site?
-
Add media
-
Emergency procedures not displayed on site?
-
Add media
-
Lack of or inadequate first aid kits and equipment on site
-
Add media
-
Trained first aider on site?
-
Unsuitable or inadequate communication equipment?
-
Add media
Traffic Management
-
Lack of or inadequate traffic management plan on site?
-
Add media
-
Inadequate controls for TMP? i.e incorrect signage, barriers, speed limits
-
Add media
-
Are there signs 50m from work site?
-
Add media
-
Is there room for pedestrians to safely walk down the road?
-
Photos of incorrect pedestrian access
-
Action taken?
-
Add media
Personal Protective Equipment (PPE)
-
Lack of, incorrect user or inadequate PPE?
-
Action taken?
-
Lack of system to issue, inspect, replace and monitor PPE?
-
Add media
Work Environment
-
Insufficient lighting?
-
Add media
-
Lack of or inadequate noise/vibration control?
-
Add media
-
Site Cleanliness?
-
Add media
-
Have all trip hazards been eliminated?
-
Add media
Environmental Hazards
-
Lack of or inadequate environmental management plan?
-
Add media
-
Lack of or inadequate dust suppression system?
-
Add media
-
Lack of or inadequate systems to prevent contamination entering stormwater drains?
-
Add media
-
Cess pit covers in place?
-
Add media
-
Socks around drill?
-
Add media
-
Dirt piles are all 600mm from gutter or covered?
-
Add media
-
Is there any over run of dirty water near gutters?
-
Add media
Administration Procedures?
-
Are all service plans on site?
-
Council permits on site
Follow Up Actions
-
Enter any follow up actions that will be undertaken?
Sign off
-
Add signature