DSIP Inspection: Primary Underground Installation Quality Control Form
-
Conducted on
-
Prepared by
Project Description
-
Project Description:
-
SAP Order Number:
-
Date of Review:
-
Crew Foreman:
-
Company:
-
Is construction in progress?
Design
-
You are required to verify 10% of the cable is installed to proper depth. Please enter the cable segments and depth boundaries (upper and lower) as verified by a locating device or visual inspection.
Depth Verification
-
Cable Segment number:
-
Max. depth:
-
Min. depth:
-
Installed per Design?
-
Field modifications approved by design engineer?
Work Site
-
Installation within ROW boundaries?
-
Restoration (landscaping, grade, r/w, etc.) acceptable?
Primary Cable Installation (complete when verifiable in the field)
-
Size, type and voltage as per design?
-
Cable properly grounded in field equipment?
-
Cables tagged and phasing identified?
-
Riser pole fuse size tagged?
-
Proper separation from natural gas lines?
-
Conduit size and type as per design?
-
Trench properly backfilled and tamped?
-
Define or describe the area observed:
-
Burial depth and separation per standards?
-
Define or describe the area observed:
Field Equipment
-
Correct Transformer KVA per design?
-
Acceptable equipment location?
-
Acceptable equipment orientation?
-
Work space and access as per standards?
-
Equipment grounded as per standards?
-
Lightning arrestors as per standards?
-
VFI transformers installed as per design?
-
Joint use equipment bonding per standard?
-
Interior Danger Sign - Primary Equipment?
-
Exterior Notice & Warning Sign - All Equipment?
-
Foundation and pad as per standards?
-
Equipment installed level and straight?
-
Fault Indicators installed as per design?
-
Secondary boots installed?
-
Quality of secondary splices is acceptable?
Special Crossings
-
If applicable, verify all standards and/or requirements are met (road/rail/transmission):
-
Reviewed By