Title Page
-
Conducted on
-
Prepared by
-
Location
-
Job number:
-
Contract duration in weeks:
-
Inspection week number:
-
Date:
WEEKLY SITE INSPECTION
-
Is signage displayed?
-
du Boulay sign
-
H&S Law poster/H&S signage/F10
-
Environmental policy
-
du Boulay Insurance/du Boulay H&S policy statement
-
Map to nearest A & E
-
Fire signs
-
Is asbestos report in file?
Fire Fighting Equipment
-
Fire Fighting Equipment
-
Is fire fighting equipment in place?
-
Fire extinguishers
-
Howler alarm/heat detector
-
Fire blanket
-
Emergency lighting (if applicable)
-
Fire risk assessment/fire escape plan
First Aid
-
First Aid Information
-
Is First Aid kit well-stocked?
-
Do operatives know where it is?
-
Do operatives know who the First Aider is?
Operatives
-
Site Paperwork
-
Are all operatives site inducted?
-
Are all operatives wearing appropriate PPE?
-
Have all operatives read, signed and complied with their RAMS including COSHH RAs?
-
Is Foreman's paperwork up to date?
-
Hot works permits
-
Receipt of PPE
-
PUWER/MEWP/scaffold checklists - give detail
-
Toolbox talks/Foreman's reports - give detail
-
COSHH data sheets/risk assessments
Site
-
Are any holes in ground clearly marked and properly covered?
-
Are any edges someone could fall from protected by double guard rails or similar?
-
Do those using towers have PASMA training?
-
Do those carrying out construction work have current Asbestos Awareness training?
-
Are dust control measures in place?
-
List any any other identifiable hazards
-
Photographs
-
Is site well lit, and as clean and tidy as possible?
-
Is all PAT testing in date? If not, give detail below.
-
PAT testing
-
Are tools being visually inspected for faults?
-
Are welfare facilities clean?
-
Have the Contract Manager and Site Manager taken action on last week's report?
-
Totals (to be passed to AR for KPI)
-
Site Manager Signature:
-
du Boulay Site Visitor/ Inspector Signature
-
Add signature