Information
-
Document No.
-
Audit Title
-
Project Name
-
Location
-
NPDES Tracking Number
-
Date of Inspection
-
Current Weather Condition
-
Site Activities
-
Type of Inspection
- Weekly
- Post-Storm
- Storm Event
- Pre-Storm
-
Amount of precipitation, duration
-
Inspector Name, Title
-
I certify this inspection is accurate and completed as required per the permit.
-
Date of Completed Maintenance
-
I certify the necessary maintenance was completed relative to this inspection and that the project is in compliance with the permit.
Inspection Checklist
-
Is the inspector a qualified person in accordance with Part 4.1.1?
-
Are you conducting a site inspection in accordance with one of the two schedules listed in Part 4.1.2.1 and 4.1.2.2?
-
Is there a properly maintained rain gauge on your site or the equivalent of on Part 4.1.2.2?
-
All earth disturbing areas have perimeter controls?
-
Sediment track-out on streets, paved areas, and sidewalks from vehicle exiting is minimized according to Part 2.1.2.3?
-
Stockpiles located outside natural buffers protected from stormwater in accordance with Part 2.1.2.4?
-
Is dust minimized in accordance with 2.1.2.5?
-
Has the disturbance of steep slopes been minimized in accordance with Part 2.1.2.6?
-
Adequate installation, protection, and maintenance of storm drain inlets in accordance with Part 2.1.2.9?
-
Are discharge points and receiving waters free of any sediment deposits?
-
Any sweeping/hosing soil or sediment accumulated on pavement into stormwater conveyances?
-
Have soil stabilization measures been initiated if earth-disturbing activities permanently or temporarily ceased within 14 calendar days in accordance with Parts 2.2.1.1 and 2.2.1.2 following the criteria under Part 2.2.2?
-
Are any of the following being generated at the site; concrete wash water, waste water paint clean out, oils, fuels, soaps, solvents, detergents, or other toxic substances prohibited in Part 2.3.1 and are the materials being properly maintained?
-
All pollution prevention controls installed in accordance with Part 2.3.2 are in effective operating condition?
-
If fueling and/or maintaining equipment or vehicles at the site, are effective means of eliminating the discharges of spilled or leaked chemicals being utilized in accordance with Part 2.3.3.1?
-
Are vehicle and equipment fueling, cleaning, and maintenance areas free of spills, leaks, or any other deleterious materials?
-
All storage of products, materials, or wastes are in accordance with the specifications in Part 2.3.3.3?
-
Is trash/litter from work areas collected and placed in respective material dumpsters?
-
Are washout facilities available, clearly marked, and maintained?
-
Are there any signs of visible erosion and sedimentation on or adjacent to the project?
-
Have you inspected all areas that have been cleared, graded, or excavated and that have not yet completed stabilization consistent with Part 2.2?
-
Have you inspected all stormwater controls including pollution prevention measures?
-
Have you inspected all material, waste, borrow, or equipment storage and maintenance areas?
-
Have you inspected all areas where stormwater flows within the site?
-
Have you inspected all points of discharge?
-
Have you inspected all locations where stabilization measures have been implemented?
-
If you must declare a portion of the site unsafe to inspect, describe the reasoning.
VTC1
-
Tracking pad in good condition meeting all specs and requirements?
-
Actions Taken, Date, Initials
19.2
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
WD.1
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
WD.2
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
Prowattle Perimeter Fence
-
Is perimeter fence working properly and free of damage?
-
Actions Taken, Date, Initials
16.13
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
16.12
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
16.11
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
VTC7
-
Tracking pad in good condition meeting all specs and requirements?
-
Actions Taken, Date, Initials
WYN.2
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
WYN.3
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
WYN.4
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
HOV.6
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
HOV.1
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
HOV.2
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
HOV.3
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
HOV.4
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
HOV.5
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
VTC4
-
Tracking pad in good condition meeting all specs and requirements?
-
Actions Taken, Date, Initials
WC.1
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
WC.2
-
Is inlet protection working correctly and free of debris or damage?
-
Actions Taken, Date, Initials
Gradient Slopes and Differentials
-
Are all gradient slopes and differentials working properly and meeting specifications?
-
Actions Taken, Date, Initials
Office Rock Socks
-
Are rock socks working properly and free of debris and damage?
-
Actions Taken, Date, Initials
Seed and Mulch
-
Do areas that are seeded and mulched appear to have good coverage and growth?
-
Actions Taken, Date, Initials
Grout Mixer Containment
-
Is the secondary containment around the mixer working sufficiently and containing leaks or spills?
-
Actions Taken, Date, Initials
Eco-Pan
-
Is the Eco-pan being used only to collect debris and not concrete?
-
Actions Taken, Date, Initials
Office Silt Fence
-
Is the silt fence working properly and free of debris and damage?
-
Actions Taken, Date, Initials
Concrete Washout Systems and Eco Pans
-
Are concrete washout systems and eco pans being maintained properly?
-
Actions Taken, Date, Initials
Chestnut Maintenance Yard
-
Are all materials in the maintenance yard being stored properly and is the area free of spills and erosion?
-
Actions Taken, Date, Initials
Other
-
Are there any other concerns or non-compliant observations on site at this time? (No = Maintenance Needed)
-
Actions Taken, Date, Initials
Other
-
Are there any other concerns or non-compliant observations on site at this time? (No = Maintenance Needed)
-
Actions Taken, Date, Initials
Other
-
Are there any other concerns or non-compliant observations on site at this time? (No = Maintenance Needed)
-
Actions Taken, Date, Initials
Other
-
Are there any other concerns or non-compliant observations on site at this time? (No = Maintenance Needed)
-
Actions Taken, Date, Initials