Title Page
-
Contract #
-
Location
-
Contractor
-
Drinking Water Filling Station #
- N1
- N2
- N3
- N5
- N6
- N7
- N8
- S8
- S9
- S10
- S11
- S12
-
Date & Time of Visit
Overview
Visible Workers on Site
-
Foreman
-
Concreters
-
Construction Workers
-
Plant Operators
-
Surveyors
-
Traffic Controllers
-
Other
-
Describe worker
-
Describe Other Workers
-
Describe Other Workers
-
Describe Other Workers
-
Describe Other Workers
Visible Plant on Site
-
Bobcats
-
Concrete Trucks
-
Excavator(s)
-
Excavator(s)Tonnage
- 2
- 3
- 4
- 5
- 8
- 12
- 14
- 20
-
Line Markers
-
Tip-Trucks
-
Tool-Trucks
-
Traffic Control vehicles
-
Utes
-
Vac Trucks
-
Other
-
Plant Description
-
Plant Description
-
Plant Description
-
Plant Description
-
Plant Description
Weather Conditions
-
Fine or Rain or Shower
-
Overcast
-
Temperature
-
Work Stopped Due to Weather
-
Describe Conditions
Activity
-
Site Works
-
Concreting
-
Earthworks
-
Electrical
-
Hydrants
-
Pipework
-
Pot-Holing
-
Restoration Works
-
Road Works
-
Signs, Lines, etc.
-
Solar
-
Storm Water Works
-
Testing
-
Miscellaneous
-
Describe Activity
Process
Pavement and Civil Works
-
Has the Contractor performed and documented a pre start
-
Why?
-
Visual check of licences and induction
-
Why?
-
Check that the Safe work method statement (SWMS)/work method statement (WMS) are on site, relate to the work and have been implemented
-
Why?
-
Check Environmental Management Plan (e.g. dewatering acid sulphate soil)
-
Why?
-
Have underground services been identified (e.g. Dial before you dig &/or potholing)
-
Why?
-
Have all energy sources been isolated (LOTO)
-
Why?
-
Are relevant spotters on-site
-
Why?
-
Have the required Traffic Management Plans (TMP’s) been approved by the relevant authority (Council, DTMR etc.)
-
Why?
-
Are control measures in place (barricading signs,) for both vehicle traffic & pedestrians, & in accordance with the approved TMP
-
Why?
-
Fire ant soil management in place (where relevant)
-
Why?
-
Check that all permits and risk assessments have been filled out and implemented
-
Why?
-
PPE in good condition and being worn
-
Why?
-
Housekeeping adequate (including rubbish), all personnel must be mindful when working in public areas as you are representing GCWW.
-
Why?
-
Any safety or environmental concerns
-
Describe?
Witness and hold points
-
Surface preparation inspection for pavement marking
-
Sign if accepted
-
Electrical conduit inspection prior to back fill
-
Sign if accepted
-
Concrete pre-pour (formwork, reinforcement, , levels and dimensions)
-
Sign if accepted
-
Concrete pour inspection (ready to pour)
-
Sign if accepted
-
Pavement inspection (final trim) Council Standard Drawing 05-02-204
-
Sign if accepted
-
Tapping band inspection installation inspection (hold for 4 hours)
-
Sign if accepted
-
Notes
-
Verified by