Title Page

  • Contract #

  • Location
  • Contractor

  • Drinking Water Filling Station #

  • Date & Time of Visit

Overview

Visible Workers on Site

  • Foreman

  • Concreters

  • Construction Workers

  • Plant Operators

  • Surveyors

  • Traffic Controllers

  • Other

  • Describe worker

  • Describe Other Workers

  • Describe Other Workers

  • Describe Other Workers

  • Describe Other Workers

Visible Plant on Site

  • Bobcats

  • Concrete Trucks

  • Excavator(s)

  • Excavator(s)Tonnage

  • Line Markers

  • Tip-Trucks

  • Tool-Trucks

  • Traffic Control vehicles

  • Utes

  • Vac Trucks

  • Other

  • Plant Description

  • Plant Description

  • Plant Description

  • Plant Description

  • Plant Description

Weather Conditions

  • Fine or Rain or Shower

  • Overcast

  • Temperature

  • Work Stopped Due to Weather

  • Describe Conditions

Activity

  • Site Works

  • Concreting

  • Earthworks

  • Electrical

  • Hydrants

  • Pipework

  • Pot-Holing

  • Restoration Works

  • Road Works

  • Signs, Lines, etc.

  • Solar

  • Storm Water Works

  • Testing

  • Miscellaneous

  • Describe Activity

Process

Pavement and Civil Works

  • Has the Contractor performed and documented a pre start

  • Why?

  • Visual check of licences and induction

  • Why?

  • Check that the Safe work method statement (SWMS)/work method statement (WMS) are on site, relate to the work and have been implemented

  • Why?

  • Check Environmental Management Plan (e.g. dewatering acid sulphate soil)

  • Why?

  • Have underground services been identified (e.g. Dial before you dig &/or potholing)

  • Why?

  • Have all energy sources been isolated (LOTO)

  • Why?

  • Are relevant spotters on-site

  • Why?

  • Have the required Traffic Management Plans (TMP’s) been approved by the relevant authority (Council, DTMR etc.)

  • Why?

  • Are control measures in place (barricading signs,) for both vehicle traffic & pedestrians, & in accordance with the approved TMP

  • Why?

  • Fire ant soil management in place (where relevant)

  • Why?

  • Check that all permits and risk assessments have been filled out and implemented

  • Why?

  • PPE in good condition and being worn

  • Why?

  • Housekeeping adequate (including rubbish), all personnel must be mindful when working in public areas as you are representing GCWW.

  • Why?

  • Any safety or environmental concerns

  • Describe?

Witness and hold points

  • Surface preparation inspection for pavement marking

  • Sign if accepted

  • Electrical conduit inspection prior to back fill

  • Sign if accepted

  • Concrete pre-pour (formwork, reinforcement, , levels and dimensions)

  • Sign if accepted

  • Concrete pour inspection (ready to pour)

  • Sign if accepted

  • Pavement inspection (final trim) Council Standard Drawing 05-02-204

  • Sign if accepted

  • Tapping band inspection installation inspection (hold for 4 hours)

  • Sign if accepted

  • Notes

  • Verified by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.