Information

  • Document No.

  • Audit Title

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Payroll number

  • MOCOPA qualification

  • MOCOPA expiry

  • Has a risk assessment been carried out and have all control measures been applied?

  • Has the relevant ppe been selected and checked prior to use?

  • Has the correct level of arc protection been selected

  • Has polarity been checked at 13A socket and all termination points up to and including blocks, isolators and terminal cover screw using approved equipment prior to work starting?

  • Has the voltage been measured and recorded on the service order

  • Have the relevant steps been followed in the procedure?

  • Have the meter tails been marked accordingly to the Meter Asset Diagram and procedure?

  • Has the installation been visually checked and confirmed as correct before re-energisation?

  • Is the cut out fuse the correct size for the installation and are the contacts in a working order?

  • Has polarity been checked at 13A socket and all termination points up to and including blocks, isolators and terminal cover screw using approved equipment prior to work starting?

  • Are the required sealing points secure in line with requirements?

  • Has the site been left clean and tidy and has the customer been advised on how their equipment operates?

  • Any detail relating to the installation audit that is relevant to Remedial Actions or learning needs?

  • Auditors signature:

  • Operatives Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.