Information
-
Document No.
-
Depot
-
Conducted on
-
Prepared by
-
Attendees
-
Location
Unit Information
-
Unit Number
-
Unit Description
-
Workplace being audited
Scoring 3 - Zero Errors 2 - Minor Errors 1 - Significant Errors NA - Not Applicable - Not Verified
FP&E Unit Files
-
Is there a file for each unit managed by the depot?
-
Does each file contain a separate section containing: 1. Completed FP&E Service Checklist, 2. Complete EDN documents, 3. Complete Test & Tag & RCD Test Certificates, 4. Other relevant information (i.e. Installation checklist, Engineering Change Request etc)
Event Log (Electronic)
-
Does the file exist as instructed
-
Are all machines included in the file
-
Does the data meet required standards
-
Are the Service/Test & Tag/RCD Tests completed at the specified intervals
FP&E Service Checklist
-
Are the documents completed to an acceptable standard
EDN's
-
Are all EDN's completed for all jobs raised at service
-
Are EDN's raised for all completed jobs regardless of who completed them
-
Are the EDN's completed to an acceptable standard
-
Are all raised jobs close out
-
Is there a system to manage scheduled defects
Service Schedue
-
Is there a method of scheduling up-coming services and electrical test
-
Are the services compliant with the schedule (within 2 week tolerant of scheduled date)<br>
Training - Training Schedule
-
Training records are available for FP&E (Check Service Schedule)
-
Training Records are signed by the Trainer
-
Training records are signed by the Trainee
-
Trainers Competent, Training Record SBMP 7.2-6 and SBMP 7.2-2
-
Records are dated
-
Details of training are provided
-
System for retraining is in place as per FRM-GEN-1203-3 Service Schedule
Site Preparation / Installation Documents - For Recently Installed Machines
-
1. Initial site inspection (FRM-GEN-1202-1)
-
2. Order Specification Checklist (FRM-GEN-1201-2 Machine Order Quotation Form)
-
3. Pre-Installation Checklist (FRM-GEN-1201-3)
-
4. Post Install Checklist audit (FRM-GEN-1203-1 Service Audit Checklist
-
5. ECR's for modification to existing machines or relocated machines (FRM-GEN-207-1)
Comments
-
Auditors Comments:
-
Add media
-
Remedial Action
-
CARs arising from audit
-
Auditor Name:
-
Auditee Name: