Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Foreman's Work Plan
-
Specific to the operation, comprehensive, being followed
-
Add media
Play of the day
-
Completed, addresses hazards of the day, reviewed by supt, reviewed with craft
-
Add media
Hazard analysis
-
Step by step follows work plan, pictures, reviewed by supt, signed by craft, DNA all over it
-
Add media
Toolbox meeting
-
Every box complete, crew comments noted, hands on training documented
-
Add media
Fall protection plan
-
Accurate (equipment used, sketch of system), signed by crew, followed
-
Add media
Overhead power line permit
-
Completed, OHP addressed in HA, salaried spotter, air horn
-
Add media
Excavation permit
-
At the operation, specific to location, verified utility location, signed off
-
Add media
Trench inspection
-
Competent person, accurate and complete prior to start of operation
-
Add media
Daily visuals on cranes
-
Must be completed prior to putting machine to work
-
Add media
On-the-spot lift plan
-
Weight known accurate, signed by crew
-
Add media
Critical lift plan
-
Initiated as necessary, pull tape to verify radius, proper signatures
-
Add media
Periodic rigging inspection
-
Stored properly and in good condition
-
Add media
Temporary construction devices/False work policy
-
Calc's available in the field, built correctly
-
Add media
Safety is visible
-
Proper amount of signs, strategically places in visible locations
-
Add media
Listen up, speak up mentality
-
Craft buy in, attitude, open communication
-
Add media
Operations
PPE
-
Correct for the task
-
Add media
Access
-
Planned out, FLG, pathways clear, free from trip/slip hazards
-
Add media
Housekeeping
-
Waste containers available and accessible, IS IT EXTREME?
-
Add media
Material handling
-
Well planned, square to the world, nothing touches the ground
-
Add media
Ladders
-
Condition, right ladder for task, extends 3' above the landing, built to spec.
-
Add media
Tool safety
-
Condition, proper use, trigger locks disabled
-
Add media
Electrical
-
GFCI, cords in good condition, cord routing out of access, cord covers
-
Add media
Cutting and welding
-
Proper PPE, fire extinguisher available, leads and hoses in good working condition
-
Add media
Equipment
-
Designated operator, visuals, chocks, seat belts, lights on
-
Add media
Access road conditions
-
Smooth running surface, dust control, signed properly
-
Add media
Crane set up
-
Level, swing guards in place, set up correctly
-
Add media
Trenches
-
Sloped or benched correctly, access every 25', fall protection as needed
-
Add media
Scaffolding and stair towers
-
Inspected, tagged, proper assembly, protected from public access
-
Add media
Fall protection
-
Right type, used properly, engineered, trained
-
Add media
Lock out/tag out
-
Tag filled out, positive lock out in place, proper number of locks
-
Add media
Night Operations
-
Class III vests, proper lighting, headlamps
-
Add media
General
-
First aid kits stocked, eye wash stations available, rebar caps, gas cans, etc
-
Add media
MOT
-
Properly set-up, inspected and documented
-
Add media
Management visibility
-
Foreman with operation, craft superintendent in the field
-
Add media
Subcontractors
-
Following our safety program (all aspects)
Assessment Bonus/Deductions
-
At discretion of assessor
-
Add media