General Information
-
24704 - Seaway Unit 702
-
Conducted on
-
Prepared by
-
Area/Room
Handover
-
1. Are Level and Setting out as per EDM Construction drawings?
-
2. Is Metal Structure as per EDM Construction drawings?
-
3. Is Stone Installation as per EDM Construction drawings?
-
4. Are Tops/ Architraves/ Special Items Completed?
-
5. Is Grouting/Joints Completed?
-
6. Are repairs and snags completed?
-
7. Is Silicon Completed?
-
8. Is Protection Completed?
-
9. Are there any other Comments?
-
10. IS THE ROOM HANDOVER ACCEPTED OR NOT ACCEPTED?
-
Why?
undefined
-
EDM Person
-
EDM Signature
-
Quality Finishes Person
-
QF Signature