Information
-
Conducted on
-
Prepared by
-
Select date
-
Customers Name
-
Site Address
-
Meter Location
-
Consumers Mains Size (mm sq)
- 4mm sq
- 6mm sq
- 10mm sq
- 16mm sq
- 25mm sq
- 35mm sq
- 50mm sq
- 70mm sq
- 95mm sq
- 120mm sq
-
Number of Phases in Consumers Mains
-
Sub-Board Location
-
Sub-Mains Size (mm sq)
- 4mm sq
- 6mm sq
- 10mm sq
- 16mm sq
- 25mm sq
- 35mm sq
- 50mm sq
- 70mm sq
- 95mm sq
- 120mm sq
-
Number of Phases in Sub-Mains
-
Type of Premises
-
Number of Stories
undefined
-
Main switch fitted
-
Verify the operation of RCDs to ensure they trip within the specified time.
-
Performed metered test on RCD's and Record results
-
No trip
undefined
-
Surge diverter fitted
-
Surge diverter condition
-
Number of smoke detectors fitted
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 9
- 10
- 11
-
All smoke detectors tested and functioning
-
Location of smoke detectors that failed test
-
Emergency lights fitted
- Yes
- No
- N/A
-
Test emergency lighting systems to ensure proper operation during power outages.
- Pass
- Fail
-
Visual inspection of switch board wiring
-
Visual inspection of switch board labels
-
Use thermal imaging cameras to identify hotspots or abnormal temperature rises.
-
Check that circuit breaker/fuse rating is correct for the size of cable
-
Check kA rating of circuit breakers comply with standards (minimum 6kA)
-
Visually inspect wiring system and document condition
-
Is there an earth at each lighting point
-
Is polarity correct for all power points
-
Is earthing correct for all power points
-
Record result of main earth cable resistance test
-
Earth stake location
-
Is earth stake protected against corrosion e.g painted
-
Test earthing system and record results (FLI equal or less than 1.2 ohms)
undefined
-
COMMENTS/RECOMMENATIONS:
-
Add signature