Title Page

  • Site conducted:

  • Conducted on:

  • Prepared by:

  • Brief summary of job to be carried out:

  • Job to be carried out by Broadland Housing Association or Sub Contractor:

General information about installation:

  • Photos of DB:

  • Photo of Incoming DNO Supply and relevant earthing:

  • Photos of any other points of interest (cable routes ect):

  • REC2 required:

  • Number of spare ways in DB:

  • Surge Protection present?

Description of works to be carried out:

  • Description of works to be carried out:

Labour:

  • Number of operatives required:

  • Total number of hours required:

Materials:

  • Materials Required:

  • Cost of materials if required:

Summary:

  • Additional Comments: (If required)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.