Title Page

  • Job Number

  • Location
  • Conducted on

  • Add signature

Electrical Test Sheet / Report

Pre Install

  • HAS THE ELECTRICAL HEALTH CHECK BEEN DONE FIRST (THIS SHOULD BE COMPLETED FIRST)

  • If installing 2 or more circuits OR modifying 2 or more circuits a Preliminary notice is needed to be done before the job has started - Preliminary Notice will be in Simpro Job attachments.

  • Is a Preliminary Notice Needed for this job?

  • Has this been Submitted by your Electrical supervisor - Email must be sent to Supervisor if not with job details

  • PRE Replacement: Take Photos of old Items to be replaced if replacing

  • Electrical Testing - Repeat this per circuit worked on
  • Circuit Number / Name

  • Visual Inspection

  • Continuity

  • Polarity

  • Insulation Resistance

  • Fault Loop

  • RCD Trip 0 and 180 - Record Highest result

Post Install

  • POST Install: Photos of all equipment installed

  • Has an Electrical Safety Certificate submited

CLEAN UP

  • CLEAN UP: IS SITE CLEAN AND FREE OF ANY RUBISH

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.