Title Page
-
Conducted on
-
Prepared by
-
Project Name
-
Project Number
-
Location
-
Service Disconnect
-
Service Meter
-
Service Conductors
-
Main Distribution Panel
-
Transfer Switch
-
Solar Disconnect
-
Generation Meter
-
Electric Pole with Transformers
-
BTaps
-
Polaris Fittings
-
Tap Box
-
Trough Grounding (Box Grounding)
-
Voltages
-
Conduit
-
Grounding Rods
-
Bury Tape
-
Electrical Rack
-
Labeling
-
Solar Conductor Labeling
-
Conduit/Fittings Sealed
-
Confirm Torque
-
Junction Box
-
Solar Sub Panel
-
Fuses
-
Communication
-
Is the array built in MidAmerican (utility) territory?
-
Example of Inverter Settings Screenshots
-
Take screenshots of commissioning screen.
-
Does the work performed onsite match what was design on the SLD?
-
Please take a picture of the SLD with the changes that were made.