Title Page

  • Frac/Job Name

  • Conducted On

  • Inspected By

  • Location

Source Checklist

Suction Line

  • Is the suction manifold properly installed?

  • Are all valves in the proper open/closed position?

  • Is the pig catcher properly installed?

  • Are all clamps properly installed?

Discharge Line

  • Is the flow meter installed in the correct location?

  • Are all Gate Valves/ISO Valves in the proper open/closed position?

  • Is the re-circulation manifold installed?

  • Is the pig catcher installed properly?

  • Are all clamps properly installed?

Filter Pod

  • Are the filter socks installed?

  • Is the filter pod lid secure?

  • Are all drain lines in the proper open/closed position?

  • Are all ISO valves in the proper open closed position?

  • Are all clamps properly installed?

Pumps

  • Is the pump secure?

  • Is there a fire extinguisher available?

  • Are there the fluid levels adequate?

  • Are all suction and discharge lines properly installed?

  • Are all drain lines in the proper open/closed position?

Booster Checklist

  • Is the booster pump in the proper location?

  • Is the booster pump secure?

  • Is there a fire extinguisher available?

  • Are the fluid levels adequate?

  • Are all drain lines in the proper open/closed position?

  • Are all clamps properly installed?

Pad Checklist

Working Tanks

  • What is the volume of the tanks? (AST, Minion, Harpon, Working Tanks)

  • Are the manifolds for tanks complete?

  • Are are camlock fittings secure?

  • Are all gaskets installed?

  • Are tank manifold valves in the proper open/close position?

  • Are the Gate Valves/ISO valves installed going to tanks?

  • Are the Gate Valves/ISO Valves in the proper open closed position?

  • Are all Clamps properly installed?

Pump Down Tanks

  • Are pump down tanks tied in?

  • Are manifolds for tanks complete?

  • Are all camlock fittings secure?

  • Are all gaskets installed?

  • Are all valves in the proper open closed position?

  • Are all Clamps properly installed?

  • Are Gate Valves/ISO valves in proper open/closed position?

  • Are the Gate Valves/ISO Valves installed going to pump down tanks?

Inbound Line

  • Are there any kinks in line?

  • Are road crossings properly installed?

  • Are flow meters installed in proper direction?

  • Is the Pig Catcher properly installed?

  • Are all clamps properly installed?

  • Are all Gate Valves/ISO Valves installed?

  • Are all valves in the proper open/closed position?

  • Are the Chemical inlets tied in and secure? Not Open Ended

Pumps

  • Are suction and discharge lines intalled?

  • Are drain valves in proper open closed positions?

  • Are all ISO valves installed?

  • Are all ISO valves in proper open/closed position?

Line Checklist

  • Is the layflat completely installed?

  • Does the line follow the ROW?

  • Are all road crossings installed properly?

  • Are there any kinks in the line?

  • Are there any scrapes, cuts, or holes in line?

  • Are all heads secure?

  • Are all clamps installed?

  • Are all valves in the proper open/closed position?

Signature Page

  • Checklist Completed By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.