Information

  • Site conducted

  • Document status

  • Dam Name

  • Dam location
  • Dam owner / operator

  • Basic information on the dam

  • Photos of the dam

  • Type of inspection

  • Conducted on

  • Weather conditions

  • Ground Moisture Condition

  • Reservoir level

  • Spillage?

  • approximate discharge (m3/s)

  • Inspector

  • Attendees

  • General notes

  • It is possible to specify required actions, and please consider: Monitor, Maintain or Repair

Previous dam safety review / visual inspection

  • Previous dam safety review / visual inspection report available?

  • Conducted on

  • Inspector

  • Main findings

  • List of previous recommendations and status of implementation

  • Recommendation
  • Describe using "Note" option here below and take "action" , if deemed necessary

  • Status

  • Other comments?

  • Inspections provide insight on how the dam is operating under current weather conditions and there are also a way to monitor the dam’s performance. Early detection of gradual changes can minimize problems and reduce maintenance.
    The dam should be inspected after a flooding event or post emergency situation to ensure there has been no structural damage and that all dam equipment is operating correctly.
    Observations from visual inspections should be documented in a consistent manner, using standardized, site-specific inspection forms supplemented with photographic records. Surveillance documentation must adequately filed

Reservoir

  • Slips or erosion evident?

  • Trees, woody debris, trash present?

  • Excessive sediment present?

  • Reservoir general notes

  • Reservoir photos

Embankment

Upstream Slope

  • Slope appears too steep?

  • Inadequate ground cover (loss of riprap material, stone weathering/alteration)?

  • Poor quality or improperly sized riprap deteriorates and does not protect the slope against wave action or erosion. Important to insure/restore the protection of the upstream slope.

  • Trees and/or brush?

  • Trees and brush should never be allowed to grow on upstream slope of the dam. The root systems of trees can be a potential hazard by allowing seepage pathways to develop through a dam.

  • Sinkholes, depressions, slides, or bulges?

  • Internal erosion or piping of embankment materials or the foundation of the dam can cause sinkholes/depressions. Internal erosion or piping can lead to dam failure.

  • Cracks on the embankment slope?

  • Slope instability and differential settlement between zones or within the embankment may cause longitudinal/transversal cracks.

  • Wave damage?

  • Wave can displace riprap allowing erosion or over-steepening of the bank.

  • Animal burrows on the embankment?

  • Borrowing and other animals can be quite dangerous to the structural integrity and performance of the dam. It is essential that these animals and their activities to be controlled to insure proper functioning of the dam.

  • Upstream slope general notes

  • Upstream slope photo

Top of Dam

  • Cracks, unusual settlement, low area or sinkholes along the top of dam?

  • Internal erosion or piping of embankment materials or the foundation of the dam can cause sinkholes/depressions. Internal erosion or piping can lead to dam failure.

  • Animal burrows?

  • Borrowing and other animals can be quite dangerous to the structural integrity and performance of the dam. It is essential that these animals and their activities to be controlled to insure proper functioning of the dam.

  • Material erosion?

  • Water from intense rainstorms carries surface materials down the slope and results in continuous troughs, rills, gullies, etc.

  • Top width uniform and adequate?

  • Top general Notes:

  • Top Photo

Downstream Slope

  • Slope appears too steep?

  • Seepage areas or wet areas?

  • Any changes in conditions at any existing seepage areas or wet areas?

  • Any evidence of materials being transported by seepage flow (such as discoloured water or sediment deposit)?

  • Poor vegetative cover?

  • Grass cover is a very effective and inexpensive means to prevent the erosion of the embankment surfaces.

  • Superficial erosion , gully erosion?

  • Trees and/or brush?

  • Grass cover should be routinely cut to provide a surface that can be easily inspected. Trees and brush should never be allowed to grow on or very near a dam. The root systems of trees can be a potential hazard by allowing seepage pathways to develop through a dam.

  • Sinkholes, depressions, slides, or bulges?

  • Internal erosion or piping of embankment materials or the foundation of the dam can cause sinkholes/depressions. Internal erosion or piping can lead to dam failure.

  • Cracks on the embankment slope?

  • Slope instability and differential settlement between zones or within the embankment may cause longitudinal/transversal cracks.

  • Animal burrows on the embankment?

  • Borrowing and other animals can be quite dangerous to the structural integrity and performance of the dam. It is essential that these animals and their activities to be controlled to insure proper functioning of the dam.

  • Downstream slope general notes

  • Downstream slope photos

  • Sketch

Foundation / toe drain

  • Uncontrolled vegetation at the dam toe?

  • Uncontrolled vegetation on and around dams can hinder inspection and lead to serious structural damage, significant maintenance costs, and possible failure. Control of proper vegetation is an important part of dam maintenance.

  • Soft or spongy zones?

  • Soft or spongy zones at the downstream toe of the dam are a sign of uncontrolled seepage which could result in internal erosion or piping. Immediate action is required!

  • Boils?

  • A boil at the downstream toe of the dam is a sign of uncontrolled seepage which could result in internal erosion or piping. Immediate action is required!

  • Toe drain?

  • Description

  • Foundation drain outlet submerged?

  • Foundation drain functional?

  • Estimated flow from drains (describe each drain separately):

  • Any evidence of materials being transported by seepage flow (such as discoloured water or sediment deposit)?

  • Seepage observed through the embankment outside of designated drains?

  • Seepage clear with no signs of ongoing internal erosion.

  • Rapid piping or erosion of foundation materials could result in failure of the dam. Immediate action is required !

  • Describe location and extent of seepage.

  • Same seepage locations as previous ones?

  • Increase in “wetted area” size?

  • Increase in seepage quantities or turbidity?

  • Sketch of seepage location

  • General internal drainage and seepage notes:

Inspection or drainage Gallery

  • Dam with an inspection/drainage gallery?

  • Describe

  • Gallery in satisfactory conditions?

  • Sketch

  • Gallery general notes

Left Abutment contact

  • Uncontrolled vegetation?

  • Erosion?

  • Differential movements?

  • Sinkholes, settlements, depressions, slides, or bulges?

  • Cracks?

  • Seepage?

  • Left Abutment contact general notes

Right Abutment contact

  • Uncontrolled vegetation?

  • Erosion?

  • Differential movements?

  • Sinkholes, settlements, depressions, slides, or bulges?

  • Cracks?

  • Seepage?

  • Right Abutment contact general notes

Saddle dam(s)

    Saddle dam
  • Brief description

  • Saddle dam photo

  • Saddle dam in satisfactory conditions?

  • Comment on deficiencies / safety issues

Principal Spillway

  • Approach channel: Instability of the side channel?

  • Inlet free from debris?

  • Trees and brush around the inlet?

  • Type of spillway?

  • Description

  • Weir in satisfactory conditions?

  • Sign of deterioration at the weir?

  • Sign of inadequacy of the weir?

  • Description

  • Civil works in satisfactory conditions?

  • Comment on deficiencies / safety issues

  • Gate structural elements in satisfactory conditions?

  • Comment on deficiencies / safety issues

  • Gate appears watertight?

  • Gate regularly operated/tested?

  • Redundant power supply?

  • Gate(s) general notes

  • Description

  • Trash rack in satisfactory conditions?

  • Inlet in satisfactory conditions?

  • Conduit appear structurally sound including water tight joints?

  • Signs of flow beneath or around the conduit?

  • Outlet in satisfactory conditions

  • Conduit spillway general notes

  • Chute spillway?

  • Concrete lined?

  • Spalling or scaling along the chute?

  • Cracks along the chute?

  • Erosion or cavitation damages along the chute?

  • Exposed reinforcement along the chute?

  • Slab movement/displacement or offset along the chute?

  • Wall movement/displacement or offset along the chute?

  • Leakage along the chute?

  • Sign of deterioration?

  • Sign of inadequacy?

  • Chute with a drainage collection system?

  • Outlet drains visible and clear of obstruction?

  • Describe the amount of flow from the outlet.

  • Signs of flow beneath or around the spillway outside of designated drains?

  • Energy dissipation structure in satisfactory conditions?

  • Sign of deterioration of the structure?

  • Sign of inadequacy of the structure?

  • Obstruction of the structure?

  • Structure covered with debris?

  • Erosion around the spillway outlet?

  • Brush around the outlet?

  • Spillway general notes

Auxiliary Spillway

  • Dam with an auxiliary spillway?

  • Description:

  • Spillway free of obstructions?

  • Spillway free from erosion?

  • Auxiliary spillway general notes

  • Auxiliary spillway photos

Bottom outlet(s)

    Bottom outlet
  • Description

  • Civil works in satisfactory conditions?

  • Describe deficiencies/Safety issues

  • Gates/valves and hoist equipment in satisfactory conditions?

  • Describe deficiencies/Safety issues

Outlet works(s)

    Outlet work
  • Description

  • Civil works in satisfactory conditions?

  • Describe deficiencies/Safety issues

  • HM equipment in satisfactory conditions?

  • Describe deficiencies/Safety issues

Dam surveillance

Monitoring equipment

  • Description of surveillance equipement

  • Monitoring equipment photos

  • Surveillance equipment adequate for site conditions?

  • Describe problem

  • Surveillance equipment in satisfactory conditions?

  • Describe problem

  • Surveillance equipment reliable?

  • Describe problem

Dam surveillance

  • Dam surveillance satisfactory?

  • Surveillance of dam facilities includes both visual inspection and monitoring of any installed instrumentation. The goal of surveillance is to identify deviations in performance conditions so that corrective or risk mitigation measures can be implemented before adverse consequence results.

  • In a dam monitoring system, the management of data, including all procedures beginning with the data acquisition and ending in the data analysis, interpretation and reporting, is accomplished in two main steps:
    1) data processing (set of operations including the data checking, reducing and storage, and the execution of numerical and graphical outputs)
    2) the subsequent analysis and interpretation of the dam behavior and including also the reporting of the corresponding results.

  • Regular dam inspection?

  • Correct monitoring data processing?

  • Systematic analysis and interpretation of the readings?

  • Surveillance general notes

Staff in charge of the O&M

  • Dam correctly operated and maintained ?

  • Staff with required knowledge, skills and training?

  • O&M staff general notes

Dam safety management system (DSMS)

  • Satisfactory DSMS in place?

  • A DSMS, incorporating policies, responsibilities, plans and procedures, documentation, training, and review and correction of deficiencies and nonconformances, must be in place to ensure operational availability, safe operation and integrity of the dam.
    A critical part of the DSMS is the development, implementation, and control of procedures for the operation and maintenance (O&M plan) and surveillance (instrumentation plan) of the facility, taking into account public safety and security (Emergency preparedness plan). The procedures and practices should be reviewed regularly to ensure that the information is up to date.

  • Satisfactory documents management process?

  • Documentation should be kept up to date so that there is a permanent record of (i) the design, construction, operation, and performance of the dam, and (ii) the management of its safety.

  • Instrumentation Plan compliant with WB requirements?

  • O&M Plan compliant with WB requirements?

  • EPP compliant with WB requirements?

  • Periodic Dam Safety Review?

  • Dam safety management system general notes

Other items

    Other
  • Describe

  • Photo

  • Sketch

Recommendations

Perform the following ongoing maintenance:

  • Use "note", "photo" or "Action" options if needed

  • Exercise and perform required maintenance of access to the dam and appurtenant structures

  • Clean vegetation on and close to the dam

  • Maintain slopes protection in good condition

  • Remove debris from spillway inlet / outlet

  • Maintain crest design elevation

  • Exercise and perform required maintenance of electrical and hydromechanical equipment

  • Exercise and perform required maintenance of monitoring system

  • Other (see notes):

  • Notes

Monitor the following items that were detailed in previous sections of the report. Report any significant changes to the Dam safety specialist.

  • Use "note", "photo" or "Action" options if needed

  • Seepage

  • Piezometry

  • Crest settlement / displacement

  • Embankment depressions or slides

  • Animal burrows

  • Erosion

  • Other (see notes):

  • Notes

The following items need to be properly repaired/rectified:

  • Use "note", "photo" or "Action" options if needed

  • Clean or repair access to the dam and appurtenant structures

  • Clear trees and brush from embankment, dam toe, abutments and spillway areas

  • Backfill rodent burrows and initiate rodent control program

  • Repair and stabilize eroded areas along embankment slopes, abutments and/or dam toe

  • Clean or repair surface water drainage system

  • Clean or repair toe drain and dam drainage system

  • Clean, repair and/or secure dam monitoring system and equipment

  • Clean or repair electrical and/or hydromechanical equipment

  • Other (see notes):

  • Notes

Employ an engineer/contractor experienced in design and construction of dams to:

  • Use "note", "photo" or "Action" options if needed

  • Perform a visual inspection of the dam and appurtenant structures

  • Perform an underwater inspection of the dam and appurtenant structures

  • Perform a geotechnical evaluation to determine cause of slides, depressions and/or seepage.

  • Update the hydrological study and/or the hydraulic safety analysis

  • Conduct a bathymetric survey of the reservoir

  • Develop and/or implement a sustainable reservoir sedimentation management strategy

  • Update the structural study, incl seismic load

  • Develop or update the dam safety plans (instrumentation, O&M and EPP)

  • Evaluate and repair civil works of the spillway and/or outlet structures

  • Evaluate and repair or upgrade electrical and/or hydromechanical equipment of the spillway and/or outlet structures

  • Repair or/and update surveillance equipement

  • Implement a tool for monitoring data analysis, interpretation, reporting and storage

  • Develop action plan and specifications for proper repair of the dam.

  • Instruct and train the staff in charge of O&M and dam surveillance

  • Develop and implement a Dam Safety Management System

  • Other (see notes):

  • Notes

Overall Condition

  • SATISFACTORY
    No existing or potential dam safety deficiencies recognized. Safe performance is expected under all anticipated loading conditions, including such events as infrequent hydrologic and/or seismic events.

    FAIR
    No existing dam safety deficiencies are recognized for normal loading conditions. Infrequent hydrologic and/or seismic events would probably result in a dam safety deficiency.

    POOR
    A potential dam safety deficiency is clearly recognized for normal loading conditions. Immediate actions to resolve the deficiency are recommended; reservoir restrictions may be necessary until problem resolution.

    UNSATISFACTORY
    A dam safety deficiency exists for normal conditions. Immediate remedial action is required for problem resolution.

  • Overall Rating of Dam Condition

  • General Notes

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.